- Placement of the heat generator - requirements for the room
- Installation Features
- How to install
- Self installation
- Rules for the installation of gas appliances in the apartment
- Varieties of devices
- Mechanical
- Electronic
- Programmable
- Wired and wireless
- Requirements for installing a boiler in an apartment
- Required documents
- boiler room requirements
- Chimney installation
- Switching to individual heating: advantages and disadvantages
- Double-circuit boiler
- User manual
Placement of the heat generator - requirements for the room
Heating gas-using equipment is much easier to install than to issue permits and put into operation. We propose to consider the first question - independent installation of a wall-mounted gas boiler in an apartment or a private house. We gave the algorithm of actions for obtaining technical conditions and developing a project in the instructions for installing a double-circuit heat generator.
The requirements of the norms for the room for the location of the gas heating unit are as follows:
- The heater must not be installed in living rooms and bathrooms. A hinged boiler may be placed in the corridor, in the kitchen and other non-residential premises on any floor, outdoor extension or a separate boiler room.
- If a wall-mounted heat generator runs on a liquefied propane-butane mixture from cylinders or a gas tank, it cannot be installed in the basement of a private house.
- The minimum allowable ceiling height is 2 m, the volume is 7.5 m³. If there is a natural gas water heater in the room, then the requirements become more stringent: the ceiling height should reach 2.5 m, the volume should be 13.5 cubic meters.
- The room should have windows facing the street. The minimum dimensions of the glazed part are calculated as follows: we multiply the volume of the room by 0.03, we get the area of the translucent structure in m².
- When installing a furnace, supply and exhaust ventilation is required. Within 1 hour, the room air must be renewed three times (3-fold air exchange). To the volume of inflow, we add the air consumed by the burner for fuel combustion. In the kitchen, a window is made for ventilation.
- The minimum distance from the front panel of the suspended boiler to the wall or other objects is 1250 mm (passage width).
The above rules apply equally to all types of heating units - wall and floor, with an open and closed combustion chamber. The installation site of the boiler must be agreed with the engineer who is developing your project. The designer will tell you where it is better to hang the boiler, given the location of the gas pipe.
Our expert will tell you more about the requirements for a gas boiler house in the video:
Installation Features
Boilers Proterm Skat 9 kW are supplied with all necessary fasteners and elements. In addition, the kit includes instructions that describe the process of connecting and setting up the unit step by step.It is worth noting that models that differ in power have exactly the same principle of installation, operation, and configuration.
Before installing heating equipment Proterm Skat, it is necessary to coordinate all work with electrical distribution services.
Electric boilers Proterm Skat with a power of 9 kW can be connected to a conventional 220V power supply. Installation of such heating equipment is carried out using a mounting plate. Such a unit does not have certain restrictions on the choice of installation location. Of course, there are some requirements - you need free access for service, maintenance, adjustment and repair of heating equipment.
How to install
Electric boiler Proterm Skat connects to the piping system using nozzles. The heater is connected in such a way that, in the event of malfunctions during operation, the coolant can be freely drained without affecting the entire system. Additional valves allow you to fill the system with coolant and drain it. also, in order to exclude freezing of water in houses with seasonal residence during cold periods, experts recommend removing the coolant completely from the system before the temperature drops.
The Proterm Skat boiler is connected to the mains through a power line connected separately. The network cable is connected to the terminals, which are located in the lower corner of the case. All screws on the connectors must be carefully tightened. A boiler with a power of 9 kW can be connected to a single-phase network.
Electric boilers are the easiest to install and connect, they do not require the organization of a chimney and supply and exhaust ventilation, a separate room for the boiler room.Since standard heating elements already contain all the necessary elements and components (circulation pump, expansion tank, safety group, etc.), when organizing a simple heating system, there is a minimum of communications around the electric boiler.
All these factors allow, having basic skills and knowledge, to install and connect an electric boiler on your own, without the involvement of craftsmen.
But note that the condition for granting a guarantee from most manufacturers is the installation by a specialized service organization. However, the ease of installation has a positive effect on the cost of the work of the masters.
Self installation
To properly connect all the connecting elements, you need to put the boiler in a prepared place. These can be refractory slabs, a concrete base, and even a small podium. If a solid wooden podium is mounted, then it is covered with a metal sheet, which at the final stage should protrude at least 28 cm beyond the body.
Reliable connection of the wall-mounted boiler depends on the correct installation of the unit, so the horizontal is carefully checked by the building level. If the floor boiler was installed incorrectly, then the position is corrected using movable legs, or fragments of a steel sheet can be placed under the body.
Rules for the installation of gas appliances in the apartment
The least problems with the arrangement of individual heating occur among the owners of new apartments that are not connected to a centralized heating system.In this case, there is no need to visit the heating network and there is no need to deal with disconnecting from the risers, and permission to install gas heating in an apartment building may be in the package of documents for real estate.
But in this case, you need to follow certain rules. First of all, having documents in hand, you cannot install gas equipment on your own - this work should be done by specialists. These can be not only employees of a gas supply organization, but also representatives of a company that licenses this type of activity.

After the installation is completed, the engineer of the company supplying gaseous fuels will check the correctness of the connection and issue a permit to use the boiler. Only then can you open the valve leading to the apartment.
Before starting, according to the requirements for installing a boiler in an apartment building, it is imperative to check the individual heat supply system. To do this, it is launched under a pressure equal to at least 1.8 atmospheres. You can control this parameter using the pressure gauge of the heating unit.
If the pipes are built into the floor or walls, it is advisable to increase the pressure and drive the coolant through them for at least 24 hours. Only after testing the system can you be sure that there are no leaks and reliable connections.
Air must be bled from the equipment before start-up. Since when installing a gas boiler in an apartment building, the systems are made closed, you need to use the Mayevsky taps available on the radiators. Air is bled in each battery, bypassing them several times in turn until there is no air left in them.After that, the system can be launched into operating mode - turn on the heat supply.

It is necessary to place an electrical outlet and another gas appliance at a distance of at least 30 centimeters from the unit.
Varieties of devices
The choice of a remote thermostat for a gas boiler is based on taking into account several characteristics, which include the type of connection. Uninterrupted operation is ensured by the contact of the remote module with the device that controls the operation of the gas boiler. From a constructive point of view, there are a couple of main options:
- cable models connected to the gas boiler through wires;
- wireless models with a remote maintenance method.
Mechanical
- durability;
- low cost;
- the possibility of repair;
- resistance to voltage drops.
The main disadvantages of mechanics include not too precise setting and the likelihood of errors within 2-3 ° C, as well as the need to periodically adjust the indicators in manual mode.
Electronic
In most cases, electronic thermostats for gas boilers are represented by a remote sensor with a display and a special control element responsible for the operation of the boiler. Currently, for this purpose, models with a timer are used that monitor the air temperature and change it according to the desired schedule, as well as electronic analogues. The main advantages of electronic devices:
- remote control;
- the smallest error;
- possibility of installation in any room;
- air temperature adjustment according to the schedule;
- the fastest response to temperature changes.
Almost instantaneous response to changes in indoor air temperature allows for significant energy savings. The disadvantages include only the rather high cost of such modern devices.
Programmable
The so-called "smart" technology has decent functionality, which includes temperature control, hourly adjustment and programming according to the days of the week. Especially popular are liquid crystal models that have a very convenient and intuitive interface, as well as built-in Wi-Fi.
Important advantages of programmable models:
- the presence of the function "day-night";
- significant energy savings;
- programming the mode for a long time;
- possibility of remote control of the entire system.
Gas heating boilers are equipped with devices with built-in SIM cards, which allows you to make adjustments using the most common smartphone. Users attribute the rather high cost of these devices to the disadvantages of any programmable models.
Wired and wireless
Wired thermostats are characterized by the presence of mechanical or electronic control. Such devices are fixed only by means of a wired system designed to be connected to gas heating equipment. The range of action, as a rule, does not exceed 45-50 meters. In recent years, programmable models of wire-type room thermostats have been increasingly installed.
Wireless devices include a working part for mounting directly next to the heating device, as well as a tracking element with a display. Sensors can be equipped with a display-sensor or push-button control.Functioning is provided by a radio channel. The simplest models are able to turn off or supply gas. In more complex devices, there is also a special program for settings in order to make changes to the specified parameters.
Requirements for installing a boiler in an apartment
How to install a double-circuit gas boiler in an apartment? Often the installation of such equipment is difficult for a number of reasons (lack of a central gas pipeline, difficulties in obtaining permission, lack of conditions, etc.). To register, knowledge of the laws and basic rules is required. In case of unauthorized installation of a gas heating boiler, you will have to pay a large fine and dismantle the boiler. You need to start by getting permission.
Required documents
To mount the boiler in an apartment with existing central heating, you need to collect a package of documents and go through several authorities in stages:
- After submitting an application to the state supervision authorities, if the conditions for installation and maintenance of the heating device are met, technical specifications are issued, which are a permit for the installation of equipment.
- After receiving the conditions, a project is created. It can be performed by an organization that has a license for this type of activity. The best choice would be a gas company.
- Obtaining permission to enter the boiler. It is issued by inspectors of companies that check ventilation. During the inspection, an act will be drawn up with instructions that need to be eliminated.
- After collecting all the documents, the design documentation for the installation of the boiler in a separate apartment is coordinated. Within 1-3 months, employees of state supervision must complete the coordination of installation.If no violations are found during the collection and preparation of documents, the consumer receives a final license for the installation.
- Documents for refusal of service are submitted to the company providing heat supply services.
You can't break the rules. Only the fulfillment of all conditions will allow obtaining permission to install gas equipment.
boiler room requirements
The room in which the boiler is installed must meet the following requirements:
- Gas equipment can only be installed in non-residential premises with tightly closed doors. For installation, do not use the bedroom, utility rooms, kitchens and toilets.
- It is best to install a gas meter in the kitchen. In this case, an additional pipe is introduced into the room.
- All surfaces (walls and ceiling) in the room must be lined with refractory materials. It is advisable to use ceramic tiles or gypsum fiber sheets.
- The area of the room for installation must be at least 4 m2. It is required to provide access to all nodes of the gas boiler for high-quality maintenance of the system.
Chimney installation
Installation of heating on gas in apartments is allowed only with normally functioning ventilation and a system for removing combustion products. Therefore, it would be optimal to use a boiler with a closed combustion chamber, which is connected to a horizontal pipe for smoke removal. In this case, it will not be necessary to carry out several pipes for ventilation and smoke removal.
If several owners in the house want to switch to individual heating at the same time, the chimneys are combined into a single cluster.One vertical pipe is attached outside, to which the horizontal pipes coming from the apartments are connected.
For normal operation of the system, it is necessary to install devices for air circulation with high throughput in the boiler room. Such ventilation should be installed separately, without contact with the general one.
Switching to individual heating: advantages and disadvantages
Switching from central heating to gas requires a lot of money and labor. It takes a lot of time to issue permits, so you need to plan and start collecting the necessary papers long before the proposed installation.
Most representatives of state structures will prevent disconnection from the central heating system. Permits are issued reluctantly. Therefore, problems with paperwork are the main drawback in the transition to gas heating.
Switching cons:
- Unsuitability of the apartment for the installation of individual heating systems. To obtain a permit, a number of steps must be completed. Partial reconstruction costs a lot.
- Heating appliances require grounding. It is difficult to do this in an apartment, since according to SNiP it is impossible to use water pipes or an electrical network for this.
The main advantage of such heating is efficiency and profitability. The cost of re-equipment pays off in a few years, and the consumer receives energy independence.
Finished construction
Double-circuit boiler
The scheme for connecting a double-circuit gas boiler to the heat supply system of a private house is carried out, as well as a single-circuit one. The difference lies in the presence of additional pipes for the DHW system.They are installed on gas heating boilers as follows:
- On the right, between the gas pipe and the return pipe, there is a branch pipe for connecting to a cold water supply system;
- On the left, between the gas pipe and the supply, there is a pipe for supplying hot water to the local DHW system.
Just like a heating system, the DHW pipes are separated from the boiler by ball valves at separate connections. Connection of cold and hot water supply is carried out without any restrictions. As an additional element, a special filter is used on the cold water supply pipe. It is recommended to use it in old systems with a centralized water supply with a large amount of solid insoluble particles in the stream. They can settle on the walls of the secondary circuit heat exchanger, reducing the heating efficiency.
User manual
Control Panel
The unit comes with a user manual. The document contains the basic rules for operating the boiler:
- If there is a burning smell in the room, do not turn on the light, smoke, use the phone. The device is immediately turned off from the network, and the boiler room is ventilated.
- There must be a place for service near the device. A gap of 30 cm is needed above and below the structure. 10 cm remains on the side and 60 cm near the front.
- With a long departure, the valves for heating, hot water supply and gas supply are closed.
- The recommended coolant pressure is from 1 to 2 bar.
- Do not store explosive and flammable substances, paint and varnish products near the boiler.
- Press MODE to select the heating mode. To go to "Summer" - the same button twice, to "Vacation" - three times.
- The water temperature parameters are adjusted using the plus and minus keys.
- To set the temperature indicator of the heating main, you will need to press MODE, and then - "plus" or "minus".