- Latest changes in gasification rules
- When is it possible to connect after disconnection?
- Benefits for connecting gas to a dacha, a private house
- We recommend reading:
- What is included in the turnkey home renovation service?
- Requirements
- The nuances of gasification of the cottage
- Rules for connecting gas to the house
- Rules for connecting gas to private households
- Gas pipeline laying methods
- HELP WITH GAS SUPPLY ON THE TERRITORY OF NEW MOSCOW:
- What are gas holders?
- SCHEME OF WORK FOR THE DESIGN OF GAS CONNECTION
- REQUIREMENTS FOR GASIZED PREMISES
- General procedure for restoring services
- How to order a gas supply project for a private house
- Who is eligible for benefits
- COST OF SERVICES FOR OBTAINING TECHNICAL CONDITIONS FOR GAS
- BENEFITS OF COOPERATION
- GAS SUPPLY AND GASIFICATION SERVICES IN MOSCOW AND THE MOSCOW REGION
Latest changes in gasification rules
In 2020, the gasification of private housing has undergone some changes, and, among other conditions, the issue related to payment for these services has been adjusted.
The price of a tie-in into a gas pipe in the rules fluctuates at the level of 20-50 thousand rubles, and this is already included in VAT.
Also, the cost from this year is differentiated depending on the category of consumer, this allows you to reduce the total amount for individuals.
The new rules say that hosts are now classified according to the principle of consuming a certain amount of a resource per year, as well as the distance between the house and the connection point.
Only this year, the rule began to work, according to which a private building can be connected to the network only with technical conditions, and the validity of these documents has decreased to a period of 70 days.
From now on, prepayment for connection is made at the level of 50% of the calculated amount no later than 11 days after signing the contract, and the rest is also paid after 11 days, but only after confirmation of the connection act.
Supplying gas to a private building is a task that will require investment and time from the owner of the building.
This issue must be agreed with the municipal energy supply service, after which the technical specifications should be prepared and approved.
Only after connecting to the main and supplying energy to the equipment, the work can be considered completed and resources can be used.
When is it possible to connect after disconnection?
Paragraph 45 of Government Decree No. 549 (as amended in May 2014) on the procedure for supplying gas determines the right of a gas supply organization to turn off the supply of a utility resource for non-payment unilaterally, notifying it of the upcoming event 20 days before the sanction. Read about the procedure and rules for turning off gas in a private house for non-payment.
If the opportunity to pay debts has been missed and the gas has already been turned off, you will have to go through a difficult (and expensive) path of reconnection, one payment of the amount of the debt is no longer enough.
- The invoice for debts is issued at the rates of the period in which the debt arose, the rate for penalties depends on the region.With a personal appeal, you can agree on a reconnection until the debt is paid in full.
At the same time, an individual payment schedule is drawn up, including the payment of fines. The personal presence of the debtor in this case is desirable, but not necessary: familiarization with the terms of payments in the latter case will occur at the signing of the contract.
- In addition to the amount of debt, technical work to disconnect from the gas transmission network will have to be paid.
- For a new gas connection, you will also have to pay for the relevant work to resume gas supply and remove seals from appliances.
After all amounts are paid or contracts are signed that regulate the payment procedure, you can count on gas connection again.
Benefits for connecting gas to a dacha, a private house
The state actively helps citizens with all kinds of subsidies, deductions and benefits. However, unfortunately, there are no privileges for connecting gas to private houses.
Nevertheless, the federal authorities granted such powers to local authorities (regions and municipalities) - to independently establish benefits for various categories of citizens, based on the characteristics of each locality (relief, climate).
So, in some regions there are bonuses (compensations) for connection payments, which are established by local authorities for certain categories of citizens.
Benefits may be provided:
- large families;
- Participants and invalids of the Great Patriotic War;
- Disabled people of the first and second groups.
To receive a gas connection discount, you must send a corresponding application to the local gas service. You will receive a discount or full refund if you are part of a designated group of people.

There is also the so-called presidential program for the development of rural settlements. It provides for free reconstruction of gas networks in some settlements. If you are a resident of such a settlement, all the costs of laying the gas pipeline are covered by the state, you only pay for the gas supply personally to your house.
To clarify do you qualify for benefitsYou need to contact the administration of your locality and clarify all the details.
Buy a gas boiler
We recommend reading:
What is included in the turnkey home renovation service?
All about country life and real estate
Where is Moscow expanding? And what does this threaten summer residents? 294265
Will the Central Ring Road be able to unload the highways near Moscow? 163312
What metro stations will be built in the suburbs? 155012
What areas of the Moscow region are the cleanest and dirtiest in terms of ecology? 140065
The best cottage settlements of the Moscow region 106846
Where is it better to live in the suburbs? District rating 82935
How much does it cost to connect the house and land to communications? 79441
How many acres of land do you need to build a house? 72106
Districts of New Moscow. What are their advantages and disadvantages? 68760
How to calculate acres of land? 65390
Building norms and rules for the development of land plots 64414
What are the exhibitions of finished houses in Moscow and Moscow region? 62492
What houses are currently being sold in the Moscow region? 60956
What is land without a contract? 58012
What are the restrictions on building near rivers and water bodies? 55623
Do basements and basements count as floors? 51221
What taxes need to be paid for a house, garage, sauna and other buildings? 51086
Which home heating is more profitable: gas or electric? 48237
Is it profitable to build a house for sale? 44774
The best places for fishing in the suburbs 43577
Landscaping from scratch. Where to begin? 43110
Pitfalls when buying a house
What do you need to pay attention to? 42219
How to bargain for a house? 42096
Is it possible to get out of SNT? 42017
Where will the gas be soon? Plan for gasification of settlements near Moscow 37860
Life in a cottage village. Pros and cons 37039
Do I need a permit to build a house on my property? 34080
The largest and most expensive cottages in Russia 33652
How much does it cost to build your house? 32879. Is it worth buying a house in SNT for permanent residence? 32261
Is it worth buying a house in SNT for permanent residence? 32261
What is the best way to build a house for permanent residence? 31142
Requirements
Gas connection in our country is carried out in a certain order. Before it is carried out, the owner of a private house should install all the necessary equipment. You should be guided by special rules SP 402-1325800-2018. This document has been in force since June 2019, and in case of any violation of it, gas will not be supplied to you.
Homeowners have a lot of work to do. So, in particular, it is allowed to connect a maximum of 2 gas boilers. Moreover, they are located either in the basement or in the basement. In the room where they will be located, it is necessary to install a window that can be easily knocked out if necessary (metal-plastic ones are allowed).
A private house is equipped with a gas meter, a pressure controller and a thermometer. All this is mounted before it is time to lay the pipes.
Any equipment is bought from a certified manufacturer - only it can be connected.
Hoses that allow gas to be supplied to appliances should be used:
- flexible;
- metal;
- no longer than 150 cm.
How much do they cost in your area? About 500 rubles. You don't need to save on them.
In the kitchen, the stove is installed so that it and the opposing wall are separated by at least a meter. At the same time, a crane is mounted in front of it, from which you will run a hose. It is equipped with a dielectric gasket.
If in a private household tiles are not placed in a room, but, for example, on an open veranda (under a canopy), then its burners are protected from the wind.
You will not be allowed to run gas if the kitchen does not meet certain standards:
- height - at least 220 cm;
- the presence of ventilation (channel);
- opening window;
- door with a gap near the floor.
Moreover, when a 2-burner tile is bought, then the volume of the kitchen is needed at least 8 cubic meters. For a device with three burners, you will need 12 m³, and with four - all 15.
It is impossible to say for sure how much work on arranging the premises in accordance with the rules can cost, but if the requirements are not met, then the gas will be refused.
The nuances of gasification of the cottage
Under the terms of Decree of the Government of the Russian Federation No. 1314 dated December 30, 2013, in force since March 2014, the homeowner is not obliged to independently resolve the issues of connecting his estate to the gas pipeline.
The preparation of specifications, the coordination of the passage of the gas pipeline through the lands of other owners and the resolution of other "gas" issues have become completely the prerogative of the gas distribution organization (abbreviated as GDO).
It is oblgas or raygas that are obliged to bring the gas pipeline to the boundaries of the applicant's site according to the completed application.

Technical conditions for connecting gas to a private house, as well as the price of gasification are part of the agreement with the GDO.
Previously, before Decree No. 1314, specifications were a separate document that served as a justification for the design and construction of a gas pipeline. Now the technical conditions are just an appendix to the gasification agreement, i.e. not a standalone document.
Note that the technical conditions provided at the request of the homeowner within two weeks are preliminary.
By providing them, the gas distribution organization only informs about the admissibility of gasification and it is impossible to use these data for the construction of the gas pipeline. However, preliminary specifications are required only for industrial consumers with a methane consumption of more than 300 m3/h.
Rules for connecting gas to the house
On the territory of Russia in 2020, the rules adopted last year apply. It is on them that we need to focus on solving the issue of gasification. The fulfillment of these conditions is considered mandatory, so you should first familiarize yourself with them and clarify incomprehensible points.

Gas equipment must comply with prescribed standards. In 2019, these rules were tightened due to frequent accidents and tragedies associated with gas leaks and other malfunctions. The new gasification rules mainly concern private houses, which is relevant for our review.
According to the order of the Ministry of Construction, the following changes have been introduced:
- no more than two boilers can be installed in the basement or basement of the house. Installation of double-glazed windows is acceptable;
- temperature and pressure control devices, gas flow meters should be installed in the room;
- you can install only certified equipment manufactured at special factories in compliance with all standards;
- sealed hoses are used to connect the gas boiler. They must be safe and no more than 1.5 meters long;
- the gas stove is placed at a distance of at least 1 meter from the wall;
- a gas stove is installed only in a kitchen with a shelf height of at least 2.2 meters. Depending on the number of burners, space norms are prescribed in cubic meters;
- the room for installing the stove should be with windows and well-ventilated;
- if in your house the kitchen is connected to other rooms like a studio, you will not be able to install a gas stove;
- in gas boilers, a closed-type combustion chamber must be provided.
If you do not comply with at least one of the established rules, gasification will be denied. The owner is responsible for the security and gasification of a private house.
Rules for connecting gas to private households
Connection to the gasification system has always required compliance with a certain order. The main condition was the presence and installation of gas equipment in a residential building in accordance with the requirements established by regulatory enactments.
Gas will be supplied to residential buildings only if the following requirements are met:
- Gas boilers (no more than two) can only be placed in the basement or basement.
- Double-glazed windows should be installed in the room where the boilers are located, provided that they can be easily knocked out if necessary.
- Mandatory equipment of a residential building with pressure and temperature control devices and gas meters.
- Gas equipment must be purchased from a manufacturer with a special certificate, with supporting documents attached.
- Hoses for connecting gas equipment (no more than 1.5 m long) must be made of a material that allows gas to be supplied safely to the house.
- The distance from the stove to the opposite wall must be at least 1 m. A prerequisite is the equipment of the stove with the "Gas-control" system; between the hose and the faucet, a dielectric coupling against stray current must be installed.
- If the gas stove is placed under a canopy, then the burners must be protected from wind blowing.
There are also requirements for the kitchen room:
- Ceiling height not less than 2.2 m.
- Volume: at least 8 m³ for a two-burner stove, at least 12 m³ for a three-burner stove and at least 15 m³ for a 4-burner stove.
- Be sure to have in the kitchen: a window, a gap under the door and an exhaust ventilation duct.
If the above requirements and conditions are not met, the connection of a private house to the gas supply system will be refused. The owner of the house is responsible for fulfilling the requirements.
If the gas pipeline is located further than 200 m from the household, the cost of gasification will be quite high
The coordination of the passage of the gas pipeline through the lands of other owners, the preparation of technical specifications and the resolution of other "gas" issues have become completely the prerogative of the gas distribution organization (abbreviated as GDO).
It is OblGaz or RayGaz that are obliged to bring the gas pipeline to the boundaries of the applicant's site according to the completed application.
Technical conditions for connecting gas to a private house, as well as the price of gasification are part of the agreement with the GDO. Previously, before Decree No. 1314, specifications were a separate document that served as a justification for the design and construction of a gas pipeline. Now the technical conditions are just an appendix to the gasification agreement, i.e. not a standalone document.
Note that the technical conditions provided at the request of the homeowner within two weeks are preliminary. By providing them, the gas distribution organization only informs about the admissibility of gasification and it is impossible to use these data for the construction of the gas pipeline. However, preliminary specifications are required only for industrial consumers with a methane consumption of more than 300 m³/h.
Gas pipeline laying methods
When laying a pipeline, the question arises where it will pass. Usually neighbors do not mind if part of the communications will be located on their site. However, sometimes it becomes necessary to find out what gas along the boundary means? This is the location of pipes on the border of neighboring sections.
The gas pipeline can be laid in one of three ways:
- Underground. To do this, pipes are laid in specially prepared channels to a depth corresponding to the requirements necessary for a given area. The trenchless method of laying pipes using drilling equipment can also be used.
- Overhead. In this case, the pipe structure is located above the ground. This method is considered cheaper, but requires the installation of pipe supports and additional corrosion protection.
- Combined.The most commonly used method is in which a pipe segment can be underground and then come to the surface.
HELP WITH GAS SUPPLY ON THE TERRITORY OF NEW MOSCOW:
Main settlements:
Territory nameAdministrative DistrictSosenskoye settlementNovomoskovsky District
Resurrection settlement
Desenovskoye settlement
settlement "Mosrentgen"
Moscow settlement
Filimonkovskoye settlement
settlement Vnukovskoe
Ryazanovskoye settlement
Marushkinskoye settlement
Kokoshkino settlement
city of Shcherbinka
Troitsk cityTrinity District
Shchapovskoye settlement
settlement Krasnopakhorskoe
Mikhailo-Yartsevo settlement
Voronovskoye settlement
settlement Klenovskoe
Rogovskoye settlement
Pervomayskoye settlement
Novofedorovskoye settlement
settlement Kyiv
SkolkovoWestern District
separate site "Rublyovo-Arkhangelskoye"
separate site "Stud farm, VTB"
Gasification
Gas supply
gas pipeline
What are gas holders?
Gas holders are called special containers designed to store liquefied gas. Variable volume tanks are widely used in industry, but in everyday life only fixed volume gas holders should be used. This is due to security requirements. The working pressure of the gas in the gas tank should be 16 atmospheres.
A gas tank is a device for storing liquefied gas, its specific characteristics for each house are determined in accordance with the technical conditions of the facility (+)
Such a tank looks like a cylinder, although sometimes there are models of a spherical shape. The volume can vary within a very wide range - up to fifty thousand cubic meters, although such large volumes are not needed for a private house.There are gas tanks for installation underground, but there are also ground models.
The choice largely depends on the nature of the use of gas. For a summer cottage, which is not used in winter, a ground-based gas tank is suitable. A mobile gas tank can be used.
But if people live in a house or cottage all year round, you should definitely install an underground tank.
Gas holders designed for underground installation are more in demand than above-ground models, as they provide a stable temperature for storing liquefied gas.
Although it is easier to install a ground gas tank, there are more problems with its operation. Due to the influence of high and unstable temperatures, more stringent safety requirements are imposed on such devices. Above ground installations are also typically more expensive than their underground counterparts.
As a rule, ground models are installed where a large gas flow is not planned. The tank will be emptied periodically, so you need to immediately think: to prefer a stationary or mobile option. Refueling of mobile models equipped with towing wheels is carried out as follows:
If there is a need to use a ground model in winter, i.e. at low temperatures, you will need to use an evaporator. This is an electrical device that provides safe heating of a gas container.
As a result, LPG quickly turns into a gaseous state and enters the system, providing sufficient pressure.
Underground gas tanks can reach volumes of 50 cubic meters, but a smaller tank is usually needed for a private house.
Gas holders designed for installation underground are considered more reliable and safe. However, their installation will require more time, cost and effort.
It is associated with large-scale works. Installation above ground freezing is not allowed, and in many regions this figure is 1.5 m or even more.
The contents of the reservoir located inside the soil are almost completely at a temperature of 5-8°C. A special evaporator is not needed for this model.
For a specific site and project, the gas tank is selected in accordance with the specifications developed for autonomous gas supply systems. Usually, the organization tasked with the project is in charge of buying this device itself, using discounts provided by manufacturers to such customers.
The gas tank control system is installed on its top cover. The pressure gauge allows you to control the pressure inside the tank, which should not exceed critical limits (+)
Independent searches and purchase of a gas tank usually do not give the site owner the opportunity to save money, but increase the risk of acquiring a low-quality or inappropriate device.
On our site there is a series of articles on the selection and installation of gas tanks.
We advise you to familiarize yourself with:
- Varieties of gas tanks: the basics of classification + an overview of popular brands
- Turnkey gas tank: how to install a gas tank and install equipment
- The cost of installing a gas tank in a private house: prices for gasification work
In addition to gas holders, liquefied gas cylinders can also be used for autonomous gas supply. One such capacity is usually not enough, several are combined into a common network.
SCHEME OF WORK FOR THE DESIGN OF GAS CONNECTION
1. Residential building gasification project (for individuals):
- selection of a place for laying an underground gas pipeline;
- selection of places for distributing internal gas pipelines;
- equipment selection;
- selection of equipment locations;
- implementation of a preliminary design, coordination with the Customer;
- drawing up a working draft;
- approval of the working draft.
For a gasification project for a residential building, it is necessary to provide a plan of the gasified house, technical specifications and engineering and geodetic surveys (if you did not order a comprehensive service).
2. Project of gasification of a settlement, an industrial facility:
- analysis of a possible place for laying a gas pipeline route, including preliminary coordination with executive authorities, local governments, operating services, determination of private land ownership;
- performance of engineering-geodetic and engineering-geological surveys, if necessary, passing the state examination, in accordance with the legislation on urban planning, additional engineering and environmental surveys are carried out;
- execution of design work;
- coordination of the project with executive authorities, local governments, operating services;
- passing the state examination, in accordance with the legislation on urban planning;
- obtaining permission to place an object in the Moscow region or an urban planning plan for a land plot in Moscow.
REQUIREMENTS FOR GASIZED PREMISES
Today it is difficult to say what specific requirements apply to the premises in which the installation of gas-consuming equipment is planned. There are at least four regulatory documents.
One of the regulatory documents (SNiP 41-01-2003 "Heating, ventilation and air conditioning") states that in the case of installing a gas boiler with a closed combustion chamber, a room volume of at least 7.5 m3 is required and does not regulate the need to install a ventilation duct in the room ( natural ventilation), while another regulatory document (SNiP 42-01-2002 "Gas supply") requires a room of at least 15 m3 and 6 m2, and according to fire safety rules (SNiP 21-01-97 * "Fire safety of buildings and structures ”), in all rooms where gas-using equipment is installed, a ventilation duct must be provided to ensure three air exchanges per hour.
Also, each manufacturer indicates its requirements for the installation of gas equipment, most often they are associated with the conditions for its further operation.
This is not a complete list of all requirements. It is impossible to develop one unified scheme for the gasification of any facility.
Therefore, the first step of ENERGOGAZ Group of Companies in gasification is a survey of the gasified object. There are no houses that cannot be gasified!
General procedure for restoring services
Paragraph 48 of the resolution provides for the restoration of gas supply within 5 days (calendar) after the payment of expenses of the company that disconnected and connected gas appliances.
The period is counted from the date of receipt of the notification about the elimination of the reasons for the disconnection. During this time, they must restore the gas supply and remove the seals from the gas meters. It is also recommended to conclude an act of connection.
Important! To connect gas, you will have to pay for it if the gas supply tariff does not include the connection service in the calculation as unplanned expenses or the Department has set a tariff for such an action in the region.
Connection steps:
- Payment of debt.
- Written notification of the services about the elimination by the subscriber of the reasons that served as the basis for the suspension of gas supply.
- Gas connection and removal of seals from the meter.
- Conclusion of the gas connection act.
How to order a gas supply project for a private house
The main condition for the gasification of a private house is the presence of gas-regulating cabinets (SHRP) in the settlement, from where gas enters the houses.
Designing should be trusted only to organizations that have a duly issued permit for this type of work: certificate of approval No. XXX and registration number from the state register SRO-P-XXX-XXXXXX. For example, for the Moscow region, this is Mosoblgaz, which owns almost 80% of gas pipelines in the settlements of the Moscow region.
The following documents are required for a design application:
- passport or notarized power of attorney to represent the applicant;
- ownership of the land and house;
- site plan with reference to the settlement;
- permission to connect the gas of the local architectural and planning department;
- a copy of the registration certificate of the house from the BTI;
- the consent of the neighbors (if the allotment is common and its laying is paid for by the neighbors);
- act of inspection of chimneys from the Ministry of Emergency Situations, fire or housing and communal services;
- documents for all gas equipment that is in the house (stove, column, boiler, etc.).
An application can also be submitted after registering in your personal account on the Mosoblgaz website.
After checking the reliability and determining the technical feasibility of connection within a month, the applicant is sent a connection agreement and technical specifications (TS). The technical specifications indicate the direction of use of natural gas, the maximum hourly consumption of natural gas, possible points of connection to the gas pipeline, gas pressure at the point of connection, as well as general engineering and technical requirements. If the volume of gas consumption is more than 5 m3/hour, in order to obtain technical specifications, it is necessary to calculate the need for heat and fuel for the year ahead.
After signing the contract, employees of the design organization will come to the site to take measurements, inspect the site and take a survey to prepare the project.
At the end, the project is agreed with the OTP and on its basis, construction and installation work and commissioning work are carried out.
Who is eligible for benefits
At the state level, there are categories of citizens who can receive benefits in the communal sector, but they do not apply to connection in any way.
And citizens can get preferences only for paying for the consumed resource. At the same time, regional legislation may provide for a certain relaxation for this service.
In almost every subject of the federation, support measures are provided for citizens who want to receive this resource.
This usually applies to subsidies for costs and such categories of citizens as:
- participants in the Second World War, as well as the disabled of that war and the widows of those who participated;
- rear workers;
- persons who lived in besieged Leningrad, as well as those who were underage in fascist camps;
- people with disabilities of 1-2 groups;
- large families.
In the Leningrad region, the authorities allocate 110,000 rubles from the local budget for supplying gas to private homes for the above categories, while the rest of the residents of this subject are entitled to receive 70,000 rubles as support.
Some regions pass laws that stipulate a percentage of expenses incurred that a citizen is supposed to pay or return, but this is usually limited to a maximum level.
In order for a person to figure out whether there is a benefit for these events in the area where he lives, you need to contact the local administration with a similar question.
COST OF SERVICES FOR OBTAINING TECHNICAL CONDITIONS FOR GAS
Prices for services for obtaining technical specifications for gas in the company "ENERGOGAZ":
FOR INDIVIDUALS
from 4,000 rubles*
FOR LEGAL ENTITIES
from 35,000 rubles*
* Subject to further interaction, the service of obtaining those. conditions for gas connection is FREE OF CHARGE
An example from real practice.
Gasification of DNP "Mozhayskoye More", located at the address: Moscow region, Mozhaysky district, settlement. Mozhaisk. There are 560 residential buildings in the DNP.
Base cost: 45,000 rubles. (due to further long-term cooperation, the service was provided free of charge)
List of completed works:
- prepared a package of documents, statements;
- the documents were transferred to the State Unitary Enterprise MO "MOSOBLGAZ";
- obtaining technical specifications and an agreement for technological connection.
BENEFITS OF COOPERATION
1. Fastest lead times thanks to the rich experience of interaction with all gas distribution organizations in Moscow and the Moscow region.
2. Affordable prices, and under the conditions of further cooperation, the service is provided is free.
3. Guaranteed positive result, and in case of negative - we will return the money.
GAS SUPPLY AND GASIFICATION SERVICES IN MOSCOW AND THE MOSCOW REGION
The group of companies "ENERGOGAZ" carries out complex work on gas supply and gasification not only within the city
Moscow, but also on the territory of the Moscow region, as well as in adjacent areas. Apply for a grant
gas supply services can be provided by individuals and organizations. The capacities of our company allow us to install the most
affordable prices for any gas work. Own equipment, contacts with manufacturers directly and
the developed technological base exclude the involvement of third-party contractors, which means that our customer can be
I am sure that you receive quality service at a favorable price for him.
Gas supply and gasification services are carried out by a team of experienced professionals with full scope
practical and scientific knowledge. We can proudly declare that each stage of cooperation from the first contact
customer to us until after-sales service is in the hands of professionals. Thanks to this
confidence, our customers receive a guarantee for all work on gas supply and gasification.
It is important for our company that cooperation remains comfortable and efficient. We take on not only
bulk orders on a turnkey basis, but also the necessary part of the cycle in a particular case
Prepare paperwork for
gas supply - please, carry out design work on gasification - we can also do it, or maybe you
you need to supply high-quality equipment at a good price - contact us!