So time each thinks about shift environment. And many not know, With what same better to begin and most main - when.
During the repair process, you can not do without construction bagless vacuum cleaner.
First, what need know about repair –what this is not only labor intensive, but more and very costly a business. And need right all plan, to in process not It was superfluous costs or shortage materials.
Second, what will help, this is choice time of the year. AT spring and summer time construction companies lift up prices on the construction materials, So how this is most favorable and comfortable time for repair. in winter prices much below and can not bad save. But from-per instability weather conditions some mounting work execute not succeed. And all—still when do repair – choice independent.
FROM what same to begin do repair?
1. redevelopment. it a business not only complex and dirty, but doable. FROM her should start off, if will remove or move interior partitions. On the this stage necessarily need do project. Accurate calculations help not make a mistake in transfer walls or replacement door opening.
2. Replacement communications and wiring work. Change metal pipes on the plastic, more modern. They are not rot and not are rusting. Here each decides myself, which quality wants get from systems life support. Further need delete old wiring and do new wiring to places alleged switches and sockets. If a No confidence in own abilities, better apply to specialists.
3. Glazing. it desirable do straightaway, So how in time substitutions will be a lot of dust and mud. Croix Togo, in time painting works not desirable difference temperature.
4. Plaster work. it the most long work. Them perform on capabilities in all premises. Walls release from old coatings, align and putty. At this main wait drying out each layer. Then walls need polish, to surface was flat.
5. Ceiling work. Of course paint not So costly, but install modern ceilings will be much faster and without superfluous mud.
6. Training for floor coatings. Here need remember, what at implementation screeds gender, have to wait not one day, to achieve complete drying out bulk mixtures. Or choose more simple option. All depends from selected coatings.
7. Installation door boxes. Performed after alignment walls and gender for correct installations door paintings.
8. Finishing walls. Before painting need necessarily prime walls. Only after applied the first layer paints. Final layer paints applied only before most installation switches and sockets. If a will stick on wallpaper, then need thoroughly wash up floor, measure out length each canvases and proceed to sticking. Only after this established sockets and switches.
9. Installation skirting boards. plinth hide all joints between outdoor coated and both.
10. arrangement furniture and general cleaning. Most intriguing moment, when torment behind. Not mud and dust, can arrange furniture and enjoy fruits his labor.
At such approach in advance planned and purchase necessary materials. Apart from estimates, such planning allows right distribute expenses and certainly maximum improve process most repair.