- Calculation of gas demand
- What facilities are allowed to be gasified?
- What facilities are allowed to be gasified?
- 2 Connection price and benefits
- Gasification of a private or country house - where to start
- What has changed in the rules for gasification of a private house
- Video description
- Conclusion
- Do I need to take permission from the owners of the gas pipeline to connect gas
- What documents (certificates, permits) are needed to conduct gas in the Republic of Belarus
- Gasification of a private or country house - where to start
- Gasification plan
- Preparation of Specifications
- The application must include the following information:
- The following documents must be attached to the application for the issuance of technical specifications:
- Categories of gasified objects
- Law on connecting gas to a private house
Calculation of gas demand
It is worth noting that for the gas supply of a private house with an area of 100 square meters, this amount of gas will be quite enough for heating and cooking.
Clause 10 of the above Rules provides that before submitting an application for connection to gas supply and calculating gas demand, it is necessary to know the footage of the room that will be heated, as well as understand the maximum hot water consumption for cases of peak consumption.
To get an accurate result, it is advisable to have a heating requirement of 10 sq.m. housing to be taken equal to 1 kW of thermal energy. Thus, a house with an area of 100 sq.m. you need a boiler with a power of 10 kW. How to calculate the gas needs for such a heating boiler, we considered in this article.
Difficulties sometimes arise with hot water supply. When calculating the needs of heat energy, it is necessary to determine the maximum hourly consumption, taking into account the fact that heating 1 cubic meter of water by 40 degrees (for example, from 8 to 48 degrees) requires 46 kW of thermal energy.
Ensuring such functionality at maximum productivity per hour will require a gas flow of 6 cubic meters. in hour. It must be remembered that equipment of this kind is operated at full capacity only in extreme cases (for example, if it is -30 outside, and at this time hot water is consumed at the same time in the kitchen and in the shower).
What facilities are allowed to be gasified?
Before you start fussing about supplying gas to an object, find out if it can be done.
According to Federal Law No. 69, it is possible to gasify: private-type houses, as well as apartment buildings put into operation; sites with buildings that have not yet been put into operation, at the stage of completion of their design; country and garden houses in the presence of capital structures (foundation); organizations.
At the local GDO, you can clarify whether and under what conditions it is possible to connect your building to gas supply.
Based on RF PP No. 549, it is impossible to connect to the gas supply network:
- objects of non-permanent structure that do not have a foundation, that is, garages, summer-type kitchens, greenhouses, and so on;
- some apartments in an apartment building, provided there is no gas in the whole building;
- country and garden houses without a capital foundation and registration in the USRN.
If you have found your object in the top list, congratulations, you can start the process of preparing and collecting documents.
What facilities are allowed to be gasified?
Before you start fussing about supplying gas to an object, find out if it can be done.
According to Federal Law No. 69, it is possible to gasify: private-type houses, as well as apartment buildings put into operation; sites with buildings that have not yet been put into operation, at the stage of completion of their design; country and garden houses in the presence of capital structures (foundation); organizations.
At the local GDO, you can clarify whether and under what conditions it is possible to connect your building to gas supply.
It is possible to conduct gas to the house even before the end of its construction, however, the gas will be launched only after the building is put into operation.
Based on RF PP No. 549, it is impossible to connect to the gas supply network:
- objects of non-permanent structure that do not have a foundation, that is, garages, summer-type kitchens, greenhouses, and so on;
- some apartments in an apartment building, provided there is no gas in the whole building;
- country and garden houses without a capital foundation and registration in the USRN.
If you have found your object in the top list, congratulations, you can start the process of preparing and collecting documents.
2 Connection price and benefits
From 01.03.2014 new rules for connecting residential buildings to the gas distribution system are in force. They contain the old norms and changes have been made that relate to the timing of work and cost. Thanks to this, the connection has become more profitable, takes less time.
Prices vary, depending mainly on the remoteness of the object, but on average you will have to pay:
- for filling out an application, obtaining a permit and primary documents - from 8 to 50 thousand rubles;
- the production of the project will cost 3-20 thousand;
- laying a pipe from the main to the facility - 2-5 thousand per meter;
- tie-in to the gas pipeline - from 10,000 to 15,000 rubles;
- a readiness check by technical supervision costs an average of 2,000.
In the regions there is a significant fluctuation in prices. For example, in the Moscow region it is 400-500 thousand for all work. The cost is determined by the distance from the capital. In the Leningrad region, 300 thousand rubles are enough, and in the Nizhny Novgorod region - 150-200 thousand. The cheapest gas pipe in a private house will cost in the European part of Russia, an average of 100 thousand rubles. Beyond the Urals, the situation is somewhat different; many settlements are located at a considerable distance from industrial centers and gas pipelines.
The region of the Far East, where there are very few highways, is problematic in this respect. Even if the main pipe is nearby, for a tie-in to a gas pipeline for an amount less than 200 thousand, one cannot count. Equipment is imported from nearby foreign countries, which affects prices. The diversity of the climate also prevents the application of standards that are used in other regions.
There are many benefits in Russia, but at the state level they do not apply to gasification. The federal government transferred this right to the local. In the regions, first of all, veterans of the Second World War, the disabled, combatants, single mothers (fathers) receive financial assistance for connection.The Leningrad region can be cited as an example: here 70,000 rubles are allocated from the budget for ordinary citizens, and 110,000 rubles for beneficiaries.
The presidential program plays an important role in rural areas. It provides:
- construction and reconstruction of gas distribution networks;
- the use of energy-saving technologies for installation;
- increasing the efficiency of the use of natural resources.
Companies are guided by federal law, the percentage of residents covered by gasification is increasing. The new rules provide for the possibility for rural residents to submit a collective application for the installation of pipes from the main to the plots. If it is satisfied, the supply to the settlement is free of charge. Property owners connect to the network at their own expense.
Gasification of a private or country house - where to start
The first thing with which the gas supply of a private house begins is the technical documentation. You need to contact the relevant authority that deals with such issues in the area. A special commission will determine the condition of the tenant and the possibility of carrying out installation work. After that, the specialists will develop a project, it will be approved by the licensing authority, and employees of the gas industry or a company that has a permit for such work will begin the connection process. Gas connection cost to a private house before the development of the project, they will only be able to tell you approximately, since the final price of materials and services consists of many components.

If a gas main is already running near the house, then you will only have to pay for the tie-in into the pipe - otherwise, the cost of the project most often includes work on laying the line along the street
What has changed in the rules for gasification of a private house
Until 2016, it was quite difficult to even approximately predict how much it would cost to connect gas to a private house, as there was no legislative regulation and control. This led to the fact that monopolists could single-handedly set the timing of gasification and its cost. But, with the adoption of new laws, the maximum time for gasification was limited to one and a half years.
The cost and timing of the approval and implementation of a gasification project for a private house are now regulated by law. This means that the party ordering the services can now take a more active part in the control of work and demand their timely completion.
Video description
What other questions arise about the cost of connection, described in the video:
Conclusion
Although gasification of a private house is a long, tedious, and expensive process, its importance cannot be overestimated. Everyone who has the opportunity to gasify their homes does it first of all, especially since with the adoption of new laws, the population has the opportunity to predict the timing of the work.
Do I need to take permission from the owners of the gas pipeline to connect gas
Dear readers! Our articles talk about typical ways to resolve legal issues, but each case is unique.
If you want to know how to solve exactly your problem - contact the form of an online consultant on the right or call the numbers presented on the site. It's fast and free!
Home Questions and orders Gasification in case of disagreement of the owners Ask faster than read.Ask a lawyer! 8189 lawyers are waiting for you The author of the question is Russia I am the owner of a land plot for individual housing construction in a cottage settlement.
But one problem has arisen: some of the land owners do not want to get gasified for money (they are waiting for it to be done at the state expense) and do not want to give permission to lay a gas pipeline through shared ownership.
What documents (certificates, permits) are needed to conduct gas in the Republic of Belarus
Gas is an explosive type of fuel, therefore, to designing gas supply systems and the installation of gas-using equipment are subject to special requirements. To develop a gasification project for a private house or an unfinished facility, you will be required to provide technical conditions. In order to obtain technical specifications (technical specifications) for connecting gas to gas supply organizations, you must provide originals and have copies of documents:
In case of gasification of an operated residential building:
- Identification document (passport) of the owner of the household
- Documents confirming ownership:
Certificate of state registration for a land plot
Certificate of state registration of real estate
Technical passport for the house
- Situational diagram of the location of the house, or copying from the general plan
In the case of supplying gas to a built house, when the house has not yet been put into operation:
- Identification document (passport) of the owner
- Certificate of state registration for a land plot
- Building permit and architectural design or specification sheet
- Situational diagram of the location of the house, or copying from the general plan
To order a project for gasification of a private house and laying a gas pipeline, it is necessary to provide to the design organization:
- Specifications (TU) for design
- Geodetic survey of the site with reference to the terrain, buildings on the site and communications
- Building documents
- For gasification of a residential building. Documents confirming the ownership of home ownership, technical passport
- For construction in progress. Statement of technical characteristics (readiness of the building is not less than 70%)
- For new buildings. Building permit and building project of the house
Gasification of a private or country house - where to start
Specifications are an extremely important preface to the gas epic. They are necessary so that at the next stage, when designing a gas pipeline, all the features of the structure and terrain are taken into account.
Obtaining technical conditions is a key moment that determines the possibility of connection in principle.
Therefore, start the business by visiting the regional operational service of the gas economy or another nearest branch representing the interests of the owner of the gas pipeline, be sure to take with you a general passport, title documents for the house and land, as well as a situational plan showing the location of the house relative to the existing gasified building ( a copy certified by the architectural and planning department).
Talk to authorized persons, find out your chances of getting connected, apply for a TU. A positive decision will be possible only if there is a reserve of network bandwidth.
If the construction of a house is only planned, you should not rush. After all, in order to start the process, you need a certificate of ownership of the house, in extreme cases - a certificate of ownership of the object of construction in progress.
That is, there must be walls, a roof, doors and windows behind which equipment can be installed. In addition, both the technical conditions and the gasification project have a limited validity period, for example, in the Moscow Region this period is 24 months. In case of delay, the laying of the gas pipeline and connection to the network will require the repetition of the first two stages. So consider when it is more convenient to submit an application, taking into account plans for the completion of construction and the arrangement of life support systems.
In order to obtain technical specifications for a house with an area of more than 300 m2, in addition to the specified documents, a heat engineering calculation will be required, performed by the design organization and determining the annual gas consumption.
For the construction of an underground gas pipeline, technical specifications for electro-chemical protection are required. The fact is that soils in different places differ in structure, mobility, corrosive activity, and not in every area it is advisable to bury a pipe in the ground. In addition, an underground gas pipeline will cost more than an aboveground one. However, this method does not affect the aesthetics of the landscape in any way and is less dangerous for the environment.
Gasification plan
The project will include the following information:
- information from previously issued technical specifications;
- places for pipelines and gas connections to the house;
- wiring communications inside the house, the location of the equipment (boilers, stoves, boilers, etc.);
- list of works to be carried out upon connection;
- list of security measures;
- estimates and calculations;
- characteristics of the equipment that will work on gas.
The gas supply project can be ordered from the GRO, or from a third-party organization that is a member of the SRO, they will definitely tell you when signing the design contract). The cost of manufacturing the project is determined according to the guidelines of the Order of the Federal Antimonopoly Service No. 1151 / (when ordering through the GDO), or at market prices (in a third-party organization).
Preparation of Specifications
In order to obtain confirmation of the technical feasibility of connection (technological connection) of the capital construction facility to the gas distribution network, it is necessary to send a request for technical conditions.
“In order to increase the openness of information as part of the process of confirming the technical feasibility of connection (technological connection) on the territory of the Samara Region, technical commissions have been established on the issues of connecting applicants to utility networks. To view the rules of procedure for the technical commissions, click here.
Use the map to determine if it is technically possible to connect (technological connection) to your facility.
An application for the issuance of technical conditions must be completed in accordance with the form.
The application must include the following information:
- Name of the Applicant;
- place of residence of the Applicant;
- postal address of the Applicant;
- telephone for communication;
- E-mail address;
- name and location of the capital construction facility that will be connected to the gas distribution network;
- the planned date of commissioning of the capital construction facility (if relevant information is available);
- the planned value of the maximum hourly gas consumption separately for various connection points (if there are several) with justification for the need to connect several points.
The following documents must be attached to the application for the issuance of technical specifications:
- copies of title documents for the land plot on which the capital construction object owned by the applicant (hereinafter referred to as the land plot) is located (will be located), and in the absence of title documents for the land plot during construction, reconstruction as part of the housing renovation program in the city of Moscow - a copy of the layout of the land plot or land plots on the cadastral plan of the territory approved by the authorized executive body of Moscow, except for the cases when technical conditions are provided for the connection of a gas distribution network facility to another gas distribution network;
- situational plan;
- calculation of the planned maximum hourly gas consumption (not required if the planned maximum hourly gas consumption is not more than 5 cubic meters);
- a power of attorney or other documents confirming the authority of the applicant's representative (if the request for the provision of technical conditions is submitted by the applicant's representative);
- a copy of the document confirming the right of ownership or other legal right to the capital construction object, if the construction of the said object is completed;
- the consent of the main subscriber for connection (technological connection) to the gas distribution and (or) gas consumption networks of the main subscriber, as well as the construction of a gas pipeline on the land plot of the main subscriber, if the connection is carried out on the land plot, the owner of which is the main subscriber, in the cases provided for in clause 34 of these Rules;
- documents provided for in paragraph 47 of these Rules, in the event that technical conditions are provided upon assignment of the right to use power;
- a document confirming the ownership or other legal basis for the gas distribution network (when reconstructing the gas distribution network), in the event that technical conditions are provided for connecting the gas distribution network facility to another gas distribution network.
Applications for the issuance of technical conditions and the documents attached to them are accepted at the Branches, Departments and Services for the operation of the gas facilities of SVGK LLC.
The reason for the refusal to issue technical conditions is the lack of technical ability to connect (technological connection) of the capital construction object to contractor's gas distribution network, including in the absence of throughput capacity of the gas distribution networks and gas transmission system technologically connected with the contractor's gas distribution network, except for cases when the elimination of these restrictions is taken into account in the contractor's investment programs or other investment programs in the current calendar year.
If there are no comments to the application and the package of documents, then the specialists of SVGK LLC develop and then issue the technical conditions to the Applicant.
Categories of gasified objects
According to Decree No. 1314 of the Government of Russia, homeowners need to find out how much it costs now to bring gas into their homes by contacting the regional gas distribution service.
First of all, household expenses for technological connection depend on the volume of gasification works. In this regard, three categories of capital objects have been identified.
The first category of objects. The first category includes private households whose total consumption of natural gas does not exceed 5 m³/h.
Small businesses are equated to them, the technological equipment of which consumes no more than 15 m³ / h of a mixture of propane and butane. Those. the lowest fee for connection to the gas distribution network is charged for cottages with an area of less than 300 m² and small businesses from the public utility area.
The installation work on the supply of the gas pipeline will be completed at the border of the site. The layout of the gas pipe for the consuming equipment of the household on its territory is carried out according to a separate project
The possible scope of work on laying connecting gas communications to the household of the first category is limited:
- the greatest distance from the main gas distributor to the equipment consuming gas is less than 200 m;
- gas pressure in the gas supply source - up to 0.3 MPa.
In addition, the laying of introductory gas pipelines is carried out without the construction of reduction points (pressure reduction) of the main natural gas.
The fee for connecting the gas pipeline for objects of the first category is 20,000-50,000 rubles (clause 8 of the appendix to the order of the Federal Tariff Service of the Russian Federation No. 101-e / 3 of 04/28/2014). The exact price is determined by the local GDO according to the conditions in the given territory, but cannot exceed 50,000 rubles.
The second category of objects. Among the objects of the second category are households, the connection of which requires distribution gas pipelines and / or the creation of points for reducing the main gas. Their estimated gas consumption is higher than the norm for objects of the first category, a higher gas supply pressure is required (i.e. 0.6 MPa or more), etc.
Compliance with the cost of connection in the first category is observed if the pipeline is inserted into a low-pressure gas pipeline. If gas reduction is required, the connection price will exceed 50 thousand rubles.
In the private housing sector, objects falling under the second category usually have an area of more than 300 m². For their gasification, standardized tariff rates are applied, calculated according to the methodology developed by the Federal Tariff Service of the Russian Federation (Appendix to Order No. 101-e / 3 of April 28, 2014).
It should be noted that applicants for consumption volumes of natural or artificial gas from 300 m³/h and above are required to coordinate gas connections with the GDS, which has a technological connection with the contractor's gas pipeline.
Approval of the amounts of tariffs for connecting gas to households of the second category is made by the local executive authority of the REC (ie the regional energy commission).
The third category of objects. The capital construction objects of the third category include farms that need an individual gasification project.For them, the amount is determined according to the design and estimate documentation, which has previously passed the examination.
The amount of expenses for gasification for households of the third category is established by the REC, related to the location of the economy connected to the main gas.
The prices for laying the gas pipeline along the section from the border entrance are not the same for different companies. However, it is worth considering the need for numerous gas project approvals. Full-fledged gasification will happen faster with an experienced contractor
The following conditions are considered to be characteristic features of the applicants' facilities in need of gasification:
- planned consumption of natural gas from 500 m³/h;
- work on connection to the gas pipeline requires the pipeline to be laid out through the forest fund, along rocky soils, swamps and water obstacles;
- gas pipeline installation work requires passing through obstacles that force the use of horizontal directional drilling.
Those. According to Government Decree No. 1314, there are actually no rigid prices for the technological connection of applicants to the gas network. The cost of gasification works depends on a number of conditions that determine its size in the framework of the relevant methods of the Federal Tariff Service of the Russian Federation.
Law on connecting gas to a private house
The main law that will contribute to the appearance of gas in the house is the Federal Law on Gas Supply. It was adopted back in 1999, but new amendments were agreed in 2018 that greatly simplify this procedure. Innovations in this area will also occur in June 2019. Now people waiting to connect will not be in the dark.The state, represented by the gas distribution company, provides for the issuance of technical specifications within two weeks, and the pipeline must be laid within two years.
The improved law allows you to connect to the gas pipeline cheaper. In some cases, this is possible even at the expense of budgetary funds (the distance from the houses to the gas distribution point is more than 200 meters). Then the residents of the village can group together and seek connection at the expense of the state.
What's new will be introduced by the Law on connecting gas to a private house in a "fresh" variation:
- You can now apply online. You can also check its status online.
- The issuance of projects now takes 15 days instead of 20. In the event that it is not necessary to build a gas distribution network to a specific house, it will take 5 days.
- Reduced terms: approval of payment for technological connection from 30 to 22 days, actual connection in the presence of an existing gas network from 12 to 3 months.
- The whole process should be transparent: the gas distribution organization should publish information about the rate of receipt and processing of applications, the shortage of capacity, etc.