How gas is connected to a private house: input device + system installation

Law on connecting gas to a private house

The main law that will contribute to the appearance of gas in the house is the Federal Law on Gas Supply. It was adopted back in 1999, but new amendments were agreed in 2018 that greatly simplify this procedure. Innovations in this area will also occur in June 2019. Now people waiting to connect will not be in the dark.The state represented by the gas distribution company provides issuance of specifications within two weeks, and the pipeline must be laid within two years.

The improved law allows you to connect to the gas pipeline cheaper. In some cases, this is possible even at the expense of budgetary funds (the distance from the houses to the gas distribution point is more than 200 meters). Then the residents of the village can group together and seek connection at the expense of the state.

What's new will be introduced by the Law on connecting gas to a private house in a "fresh" variation:

  1. You can now apply online. You can also check its status online.
  2. The issuance of projects now takes 15 days instead of 20. In the event that it is not necessary to build a gas distribution network to a specific house, it will take 5 days.
  3. Reduced terms: approval of payment for technological connection from 30 to 22 days, actual connection in the presence of an existing gas network from 12 to 3 months.
  4. The whole process should be transparent: the gas distribution organization should publish information about the rate of receipt and processing of applications, the shortage of capacity, etc.

How gas is connected to a private house: input device + system installation

Registration of gasification of the house

To obtain permission to lay a gas pipeline to a private house, you need to collect an impressive package of documents and go through four stages:

  • obtaining TU;
  • project development;
  • installation of gas pipeline equipment;
  • connection.

Required documents:

  • application for gasification from the owner of the property;
  • passport of a citizen of the Russian Federation;
  • a document on the right of ownership where gasification is planned;
  • if the pipeline will be laid through neighboring sections, the written consent of their owners is required for such a procedure.

Often, owners begin the gasification process when the house is still under construction. Naturally, they are interested in whether it is possible to supply gas to an unfinished and still unregistered house?

In this case, in addition to the documents listed above, you must provide additional papers:

  • ownership of the plot of land where the construction is carried out;
  • a copy of the registration certificate for the building, which is in the process of construction, entered by a notary;
  • application for obtaining TU (technical conditions);
  • written confirmation of the territorial state body of the legality of construction work.

Connection of an unregistered house is carried out as gasification of an auxiliary building, and not a residential one.

Obtaining specifications

Technical specifications are necessary in order to design an external gas pipeline and an intra-house gas supply system. To obtain technical specifications, you should contact the gas service to determine whether there is enough capacity for connection.

Required papers:

  • land ownership;
  • floor plan of the house or permission to build it (must be certified in the district "Architecture");
  • site plan on a scale of 1:5,000;
  • a statement signed by the head of the Gas Trust.

The minimum time for preparation of specifications is 2 weeks. The term may be extended up to one month. In practice, coordination takes much longer.

After accepting the application for gasification, according to the legislation, gas connection must take place within three months

The term of validity of the technical specifications is up to two years. After this time, the gas pipeline must be built.

Development of a gas supply project

After the owner receives the specifications for the supply of gas, a project is being developed.

The following package of documents must be submitted to the design organization:

  • THAT;
  • geodetic survey of a personal plot with all communications and buildings with reference to the terrain;
  • all documents for the construction;
  • for gasification of a non-residential building (unfinished), a statement of technical characteristics is required (the building must be at least 70% ready).

After that, you should call the master, who will carry out all the necessary measurements and draw up the documentation. Consideration of the project is carried out within 15 working days. The next step is to pay for the project. The cost of the service depends on the distance of the object to the gas pipeline.

Two projects are needed for unfinished construction. In one, the gas supply system of the building is displayed, where construction is not completed, and in the second, on the contrary, on completed housing

The project takes into account all gas appliances that are planned to be installed in the house (floor-mounted boiler or wall-mounted instantaneous water heater, gas stove, fireplace, etc.). This is done in order to calculate the required volume of raw materials.

The consumed volume of gas is indicated in the equipment passport. In addition, you must also provide a plan for the location of appliances in the house.

The customer must definitely check the finished project, so that subsequently there is no need to redevelop the premises

After the paperwork has been completed, installation and construction work begins.

Issuance of a power of attorney for gas connection

Gasification is a complex and lengthy process. Not all owners have enough free time to personally deal with this issue.

In this case, a power of attorney is issued to a private person who represents the interests of the owner of the house. This document must be notarized and attached to other papers.

BUY A GAS BOILER IN TROITSK, REPAIR OF GAS EQUIPMENT

COST OF GAS CONNECTION IN NEW MOSCOW, TROITSK

For all questions about the cost of connecting gas in the territory of New Moscow, the Troitsky Novomoskovsky districts and Skolkovo, you can contact our specialists. The company sets the most affordable prices for gasification services for private houses and commercial facilities.

Read also:  Gorenje gas stove repair: frequent breakdowns and methods for their elimination

EXAMPLES OF PRICES FOR INDIVIDUAL SERVICES

Service Description The cost of legal faces The cost of physical faces
Thermal engineering calculation Determining the amount of gas consumption from 15 000 rub. from 4 000 rub.
Engineering and geodetic surveys Creation of engineering and geodetic (topographic) site plan from 35,000 rubles/ha from 10,000 rubles/plot
Performing the functions of a technical customer Obtaining technical conditions, obtaining a contract for technological connection, coordination, obtaining the necessary permits, collecting executive and technical documentation, processing documents necessary for putting the facility into operation 10% of the cost of the full range of works on gasification of the facility 25 000 rub. Moscow region; 35 000 rub. New Moscow
Design work Gasification project for a residential building providing for laying a gas pipeline to a gasified building, laying a gas pipeline to gas-consuming equipment, selection and placement of gas-consuming equipment determined by estimate from 20 000 rub.
Construction and installation works Completed construction and installation works. A gas pipeline was laid from the connection point to the gas-using equipment (cocks were installed in front of the equipment installation site) determined by estimate from 80 000 rub.
Supply of equipment Completion and supply of equipment, installation and commissioning (commissioning), the considered example is the boiler Buderus U072-24K The cost of the boiler is 32,000 rubles. installation + commissioning 16 000 rub. The cost of the boiler is 32,000 rubles. installation + commissioning 16 000 rub.

FOR CLARIFICATION OF THE COST AND PRICES WE OFFER YOU:

HOW TO CONDUCT GAS IN THE TROITSKY DISTRICT OF NEW MOSCOW?

You are interested in the question - how to conduct gas to Troitsk or the Skolkovo region? Call the specialists of the ENERGOGAZ group of companies, who will not only tell you about gas connection schemes, but will also be able to advise the best solution to the problem. The quality of the services provided by our company is confirmed by a long-term positive reputation.

GASIFICATION OF A PRIVATE HOUSE IN NEW MOSCOW, TROITSK

The ENERGOGAZ group of companies provides services for the gasification of the Novomoskovsky district. We will help you install and connect gas on the territory of New Moscow (Greater Moscow), the Troitsky District and Skolkovo. We carry out all works on a turnkey basis, vast experience, high-quality materials, competent service.

TURNKEY GAS CONNECTION SERVICE

Basic Services

For individuals, we offer a range of services for connecting a private house/building to a gas pipeline. The scheme of work is as transparent as possible and at the stage of signing the contract, the customer knows all the terms of payments, and most importantly, has a clear understanding of the price of the entire complex of works.

For legal entities, the range of services is much wider, because wider and requests. Main services:

  • connection to the gas pipeline of settlements (SNT, DNP, KIZ ...);
  • connection to the gas pipeline of boiler rooms;
  • connection to the gas pipeline of technological equipment of plants;
  • development of gas supply schemes for districts, cities.

Additional services:

  • Connecting a gas boiler.
  • Replacement of gas equipment.

We carry out a number of activities to connect gas to various facilities. Whether it is the need to connect to the main gas pipeline, conduct gas to the site or connect to a gas boiler, ENERGOGAZ Group of Companies will cope with the task in the most efficient way. All technical conditions will be fully met, and each stage will receive formalization and the necessary approval.

GAS CONNECTION DIAGRAM WITH ENERGOGAZ

  • Appeal. The initial contact involves getting advice on all the issues that have arisen. A possible conclusion of the contract, its terms and scope of work are being discussed.
  • Conclusion of an agreement. After receiving the oral consent of readiness to conclude a contract, a responsible representative of our company and a surveyor leave for the object. The meeting involves the exchange of contracts, the coordination of advance payment and the transfer of a power of attorney for the gasification of the facility.

    Completion time: 3 working days

  • Preliminary work. In the course of preliminary work, the surveyor draws up engineering surveys, and, if necessary, a sketch of the layout of the gas equipment of the facility. Based on the requirements, an estimate is made for the possible purchase of gas equipment or installation of systems.

    Completion time: 1 business day

  • Submission of documents. After examining the object, the documents are submitted to the territorial branch-trust of the State Unitary Enterprise MO "MOSOBLGAZ".

    Completion time: 3 working days

  • Obtaining a contract for connection (technological connection). The contract is provided by the territorial branch-trust of the State Unitary Enterprise MO "MOSOBLGAZ".
  • Design work. In parallel with the submission of documents, design work on gasification is underway.We provide a sketch-project (plan) of equipment and laying of gas pipelines for written approval to the customer.

    Completion time: 5 working days

  • Construction and installation works. Upon receipt of the agreement, work is underway to install the internal gas pipeline, taking into account the place where the gas pipeline exits the ground.

    Completion time: 10 business days

  • Installation of an underground gas pipeline. The performance of these works is carried out after agreement with the branch-trust of the State Unitary Enterprise MO "MOSOBLGAZ".

    Completion time: 10 business days

  • The final stage. After completion of all construction and installation works, a folder of executive and technical documentation is transferred to the customer. All mutual settlements are made.
  • Service. With mutual satisfaction of the partnership and the need for further cooperation, a service contract is concluded.

THE GENERAL TERMS OF GASIFICATION WORKS DEPEND TO A LOT ON THE BRANCH-TRUST OF SUE MO "MOSOBLGAZ" AND CAN BE FROM 3 MONTHS TO 1 YEAR.

DOCUMENTS FOR GAS CONNECTION

To conclude a turnkey gas connection agreement with ENERGOGAZ Group of Companies, the customer will need:

  • a copy of the passport (for individuals);
  • a copy of the certificate of ownership of the land;
  • power of attorney for gasification of the house.

Technical conditions for connecting gas in a private house

Without technical conditions (TU) it is impossible to legally connect gas.

This internal document regulates:

  • maximum volume of supplied gas;
  • the place where the connection to the gas network occurred;
  • connection terms, etc.

Technical conditions are issued if the owner of a private house has fulfilled all the requirements. This document states:

  • house address;
  • volume of supply that is planned;
  • source of gas supply;
  • measures for the safe supply of gas and the operation of gas appliances;
  • document validity period.

Technical conditions can be obtained independently or use the services of intermediaries. The latter will charge for their services, but will help save a lot of time and effort. If it was decided to use an intermediary company, then first you need to certify an agreement with a notary, according to which the owner of the house gives the authority to represent his interests to the intermediary.

If any requirements for the gas supply procedure are not met, the house is far from the source or the route passes through the highway (especially of federal significance), then the gas services may refuse to issue technical specifications. But this decision can be appealed.

How gas is connected to a private house: input device + system installation

Gas appliances for a private house

When submitting documents, it is desirable to know what equipment will be used. This is especially true for the boiler. The power is chosen, keeping in mind that for heating every 10 m2, 1 kW is required, and if hot water is used, an additional 25%. According to the type of installation, there are floor and wall boilers. They differ in the principle of action:

  • non-volatile;
  • consuming electricity;
  • condensation.

Installed on the base, they have a large choice of power, heat rooms of various sizes, and a boiler for hot water can be connected to them. Compact, wall-mounted, equipped with an expansion tank and a circulation pump.

The operation of non-volatile gas equipment is based on the principle of natural circulation, these are the simplest devices. They are connected to pipelines of large diameter, the possibility of flexible air temperature control in the rooms.The room where the device with an open chamber for gas combustion is installed must be equipped with tidal and exhaust ventilation, a chimney.

Volatile boilers have a closed expansion tank, a pump and a fully automated control system. This is a kind of mini boiler room. It needs a constant supply of electricity to run smoothly. The requirements for its quality are quite strict: the voltage in the network must be stable, differ from 220 V by no more than 10%. In rural areas with constantly changing network parameters, a stabilizer will be required.

Condensing devices are the most reliable and economical, provide the most complete combustion of gas. The work uses water vapor, which gives off heat for heating. The vast majority of these boilers are mounted. They last 2-3 times longer than other types, but the price is 1.5-2 times higher.

Workers make entry into the house, connect gas appliances. Everything must be carried out in accordance with the project, deviations from it are not allowed. If the owner has changed his mind about something, for example, with the installation site of the boiler, this is possible only after making changes to the project, which is additionally paid. Equipment must have technical data sheets.

After all the activities, it is mandatory to study the safety rules for using gas. It is held in the regional branch of the company. After the briefing, the safety engineer presents a log, where the signature is put. A book is handed out.

It is possible that a specialist instructs at home when commissioning is performed. You should also sign, the document is subsequently stored in the organization.

Number of blocks: 8 | Total characters: 14997
Number of donors used: 3
Information for each donor:

Rules for connecting gas to the house

It boils down to doing the following:

  1. Submission of documents to the city gas service, which prepares technical conditions for a maximum of a month.
  2. Selection of a suitable boiler for heating and hot water supply. This equipment must be safe, reliable, durable, and meet the required design power.
  3. Boiler preparation. The equipment is installed exclusively in a room that meets all standards and requirements.
  4. Receipt of a document - an act that is issued when the chimneys and ventilation ducts comply with existing standards.
  5. Drawing up project documentation. It indicates the architectural features of the structure and all SNIP, which are agreed with the responsible authorities.
  6. Carrying out the gas pipeline and preparing documents for the commission (state).
  7. Signing an agreement with a contractor who carries out commissioning, regularly monitors and maintains equipment.
  8. Gas supply after approval by local authorities.

Each stage has its own characteristics and nuances.

The nuances of gasification of the cottage

Under the terms of Decree of the Government of the Russian Federation No. 1314 dated December 30, 2013, in force since March 2014, the homeowner is not obliged to independently resolve the issues of connecting his estate to the gas pipeline.

The preparation of specifications, the coordination of the passage of the gas pipeline through the lands of other owners and the resolution of other "gas" issues have become completely the prerogative of the gas distribution organization (abbreviated as GDO).

It is oblgas or raygas that are obliged to bring the gas pipeline to the boundaries of the applicant's site according to the completed application.

If the gas pipeline is located further than 200 m from the household, the cost of gasification will be quite high

Technical conditions for connecting gas to a private house, as well as the price of gasification are part of the agreement with the GDO.

Previously, before Decree No. 1314, specifications were a separate document that served as a justification for the design and construction of a gas pipeline. Now the technical conditions are just an appendix to the gasification agreement, i.e. not a standalone document.

Note that the technical conditions provided at the request of the homeowner within two weeks are preliminary.

By providing them, the gas distribution organization only informs about the admissibility of gasification and it is impossible to use these data for the construction of the gas pipeline. However, preliminary specifications are required only for industrial consumers with a methane consumption of more than 300 m3/h.

CONNECT GAS, GASIFICATION IN MOSCOW

ENERGOGAZ group of companies offers the following services:

  • Turnkey works on gasification in Moscow.
  • Supplying gas to a private house or commercial facility in the city of Vidnoye.
  • An integrated approach from project preparation and obtaining technical conditions to maintenance.
  • Legal support of all stages of work.

In our company you can also order any gas equipment.

The company is able to:

  • Selection of equipment according to the requirements of the facility.
  • Free delivery of the gas boiler.
  • Installation, configuration, testing of its operation.
  • Repair work and maintenance services for the gas boiler, if necessary, for the entire service life.

GAS CONNECTION COST

The ENERGOGAZ group of companies strives for long-term and reliable cooperation, therefore, when working on a project according to the “from A to Z” principle, the cost of gas connection will be the most profitable for the customer.
At the conclusion contracts for gasification "turnkey" price of work consists of the need to perform the following types of work:

  • performing the functions of a technical customer (technical conditions, approvals, commissioning);
  • survey work;
  • design work;
  • construction and installation works;
  • supply and installation of boiler (heating) equipment;
  • commissioning works.

If there is a need for gasification of any facility, first of all, the question arises - how much does it cost to connect gas in Moscow or the Moscow region? The calculation of the cost of gas connection is based on the requirements of the facility itself and those works that must be carried out. The customer of ENERGOGAZ Group of Companies will receive an estimate for all work, in which all prices will be specified.
An example from real practice.

An example of gasification at home 150 m2.

The gasification cost was 210 000 rub.

Additional payment is made for work on "technological connection" (in the region of 50,000 rubles, in accordance with RF PP 1314 of December 30, 2013) to the territorial trust of the State Unitary Enterprise MO "MOSOBLGAZ". The cost of a gas boiler and a gas stove is also paid separately. In some cases, it is necessary to replace the ground loops and examine the smoke and ventilation ducts (the cost of each service in ENERGOGAZ Group does not exceed 6,000 rubles). The cost of boiler installation and commissioning depends on the type of boiler.For example, a set of works for the installation and commissioning of a wall-mounted boiler Buderus U072-24K (the boiler heats up to 200 m2 of area and heats water for a hot water supply system, made in Germany) is 12,000 rubles.

Gasification process step by step

Consider step by step the procedure for connecting gas to a private house and what the owner of the house needs to do so that the blue fuel gets into his house and makes life more comfortable.

  1. Choice of type of gas supply. If the residential heating area of ​​the house does not exceed 250 sq.m., then fuel consumption is planned to be no more than 5 cubic meters per hour. This option falls into the first group and is the most popular for private housing.
  2. Drafting technical specifications for gas. To do this, you will need to contact the local gas workers with a number of documents. The application will be considered within a month and connection is possible only if the house is located near the main gas pipe (no more than 200 meters).
  3. Technical connection to the highway. With a positive review of all the submitted documents, a technical tie-in to the gas main is carried out. This is carried out only by specialists of the relevant service. The cost of work directly depends on the remoteness of the house from the place of insertion and the complexity of laying, it ranges from 25-50 thousand rubles.
  4. House gasification project. Perhaps the most expensive procedure in the whole process. The project must take into account all the equipment that will operate using natural gas. It also indicates the location in the premises of each device and the chimney. The cost of drafting a project is quite high if you contact a private design bureau, but the terms there are minimal.A project ordered from the Gorgas service is much cheaper, but then you will have to put up with the deadlines, which reach from 3 to 6 months.
  5. Installation work. Direct installation of gas equipment should be entrusted only to competent specialists. Be sure to sign a contract with them for the performance of all work.
  6. Gas connection. Compliance with all conditions for the installation and safety of operation of gas equipment must be checked by employees of the Gorgas before connecting to the site. For this, an application is made, and the expectation is an average of 2 weeks. The check is confirmed by a receipt, with which you need to contact the gas service and wait for the conclusion of the contract. At the same time, specialists go to the place, seal the meter and instruct on the safety of using gas equipment.

The remoteness of the house from the highway by more than 200 meters makes it almost impossible to connect it. After all, holding gas in one house will cost a decent amount. Alternatively, if several houses are located remotely, you can negotiate with their owners and apply to the gas service. If this is a whole village where there are a large number of houses wishing to connect to the gas pipeline, then it is possible to consider this issue and supply an additional pipe to the village for free.

HELP WITH GAS SUPPLY ON THE TERRITORY OF NEW MOSCOW:

Main settlements:

Territory name
Administrative District
Sosenskoye settlement
Novomoskovsky District

Resurrection settlement

Desenovskoye settlement

settlement "Mosrentgen"

Moscow settlement

Filimonkovskoye settlement

settlement Vnukovskoe

Ryazanovskoye settlement

Marushkinskoye settlement

Kokoshkino settlement

city ​​of Shcherbinka

Troitsk city
Trinity District

Shchapovskoye settlement

settlement Krasnopakhorskoe

Mikhailo-Yartsevo settlement

Voronovskoye settlement

settlement Klenovskoe

Rogovskoye settlement

Pervomayskoye settlement

Novofedorovskoye settlement

settlement Kyiv

Skolkovo
Western District

separate site "Rublyovo-Arkhangelskoye"

separate site "Stud farm, VTB"

Gasification

Gas supply

gas pipeline

Paperwork

Gas supply is carried out on the basis of the act on putting the facility into operation. The document must contain the signatures of representatives of the state commission. The work is carried out according to a work permit under the control of an engineering and technical worker.

Also, an agreement is concluded between the customer (the owner of the residential building) and the object with the GDO. Previously, the company issues technical conditions for connection. Technical conditions are not required to draw up a gasification agreement for a building. The documents prescribe the procedure for supplying gas.

All subscribers over the age of 12 are instructed. After that, they are given a subscription book, and they draw up a receipt that they undertake to follow the technical safety requirements. Also, all subscribers sign in the journal. This confirms the fact that they listened to the briefing.

Before leaving for the place of work, in order to start the gas, the manager receives an act of order. Also, he must familiarize himself with the executive documentation. Then the foreman conducts a briefing among the workers, checks the availability of all necessary tools and protective equipment.