The owner is obliged to independently provide the receiving equipment to his house. Work carried out in the house and on its own site is carried out at the expense of the owner of the house. The gas distribution company carries out only the supply of communications, as well as the connection of the supply of blue fuel.

Please note! The owner himself cannot install the equipment. The work is carried out by a company that has a license to carry out such activities. A similar rule was introduced in order to protect the owner and neighbors from improper installation, which could cause an accident.

Not a national treasure: how much does it cost to connect gas in the village

Before starting work, the contractor's employees develop technical specifications, which must contain the following information:

  • how much gas is allowed to consume per hour;
  • the period during which the developed technical conditions are valid.
  • the time during which the work on gasification of the house will be completed.

The company has two weeks to prepare the plan. After that, they send TU to the owner who wants to bring gas into his house. However, if it turns out that the gasification facility is located more than 200 meters from the main line, the service will be denied.

Attention! No one will lay a pipe for one person, because the costs of its summing up are high, varying between 1,000,000-3,000,000 rubles. However, if you unite with several residents and express a desire, then local authorities do not have the right to refuse

After agreeing on the technical conditions, the application for gasification goes to the local gas supply department to draw up an agreement. The appeal will be considered within thirty days from the date of its submission. After that, the company will make a decision, which will notify the owner in writing.

The technical specifications are being revised, subsequently they should contain the following information:

  • data on the gas pipe from which the connection will be made;
  • specific fluctuations;
  • how much gas the owner can consume per hour;
  • information about materials, for example, the diameter of the pipe used;
  • instructions to the owner on the equipment of the boiler with a special counter.

The contract is drawn up by an employee of the company. The owner carefully reads it and signs if he agrees with each item.

He contains:

  • rights, obligations and responsibilities of the parties;
  • period of work on gasification of the house;
  • the territory where the ownership of the company begins;
  • the cost of the work performed, as well as the procedure for making payments.

A home gasification project is the most expensive procedure. It is ordered from the local administration, the company that supplies gas. It takes six to ten months to develop a plan and prepare a contract.

However, if the owner wants to expedite the procedure, then he can contact a private company that has a license. The cost of their work is more expensive, however, they will do everything faster.

The owner is obliged to provide a plan of the building to be gasified, indicating possible locations, as well as a list of equipment to be installed. Some documents need to be paid for.

The plan is approved by the gas company in the event that the work was carried out by an outside organization.

Remember! When choosing a contractor, you should pay attention to the one that not only prepares the necessary documents, but also coordinates with specialized services

Benefits for gasification of a private house

In our country, there are a large number of categories of the population that are actively supported by the state through the provision of various benefits. These include low-income families or individual citizens, veterans of the Second World War or other military operations, large families or single parents with many children, and the disabled. But the current federal legislation, unfortunately, does not provide any benefits and indulgences for the gasification of private houses. There are various benefits for paying for the same gas and for housing and communal services, but there are no benefits for the construction of pipelines.

Regional benefits for gas connection

The absence of federal benefits does not mean that they can not be at all. At the regional level, the territories and regions of Russia nevertheless single out certain categories of citizens who are granted benefits for conducting gas.This benefit is expressed in compensation for connection costs. As a rule, such categories are labor veterans, large families, heroes of the Soviet Union and Russia, disabled people of all 1-2 groups, participants in the Great Patriotic War, Chernobyl victims. To receive compensation, it is necessary to collect all documents confirming the work performed and payment for them.

Let us consider in more detail the benefits for connecting gas on the example of the Rostov region.

So, according to the regional law of the Rostov region, gasification benefits in the form of compensation have:

  • Invalids of the Great Patriotic War.
  • Members of the Great Patriotic War.
  • Disabled people of I and II groups.
  • Former minor prisoners of fascism.
  • Persons awarded with the badge "Inhabitant of besieged Leningrad".
  • Home front workers.
  • Widows of the fallen (deceased) invalids of the Great Patriotic War and participants of the Great Patriotic War.
  • Large families

The amount of compensation is not more than 50% of the amount paid for the connection. But the maximum amount that can be paid is limited to 20,000 rubles (as of 2015). That is, if the actual costs of connecting gas, for example, amounted to 100,000 rubles, then the amount of compensation will be 20,000 rubles.

Compensation can only be granted once in a lifetime. To receive compensation, you must apply to the local branch of the Department of Social Protection of the Population with an application, as well as attach documents confirming the preferential status and the work performed on the gasification of the property.

In the Leningrad region, for example, there is a regional gasification benefit. A special procedure for granting subsidies for connecting gas equipment to the gas distribution network has been adopted there.The authorities of the region have set the amounts to be paid from the budget, this is 110,000 rubles for the beneficiaries who were listed above, and 70,000 for everyone else. As planned by the authorities, taking into account the subsidy, the final amount for gasification that a citizen will spend will be from 10,000 to 50,000 rubles. But an important condition is that the owner of the house must be registered in it and live in it for at least 1 year.

Read also:  Is it possible to refuse to install a gas meter: what does the law provide for?

The right of regional authorities at the local level to decide on the provision of certain categories of citizens payment benefits for connecting to gas means that when conducting gas to a private house, you need to find out from the local administration about the availability of subsidies for beneficiaries in a particular region.

Categories of gasified objects

According to Decree No. 1314 of the Government of Russia, homeowners need to find out how much it costs now to bring gas into their homes by contacting the regional gas distribution service.

First of all, household expenses for technological connection depend on the volume gasification works. In this regard, three categories of capital objects have been identified.

The first category of objects. The first category consists of private households, the total consumption of natural gas in which does not exceed 5 m3/h.

Small businesses are equated to them, the technological equipment of which consumes no more than 15 m3 / h propane-butane mixtures. Those. the lowest fee for connection to the gas distribution network is charged for cottages with an area of ​​less than 300 m2 and small businesses from the public utility area.

Not a national treasure: how much does it cost to connect gas in the village
The installation work on the supply of the gas pipeline will be completed at the border of the site. The layout of the gas pipe for the consuming equipment of the household on its territory is carried out according to a separate project

The possible scope of work on laying connecting gas communications to the household of the first category is limited:

  • the greatest distance from the main gas distributor to the equipment consuming gas is less than 200 m;
  • gas pressure in the gas supply source - up to 0.3 MPa.

In addition, the laying of introductory gas pipelines is carried out without the construction of reduction points (pressure reduction) of the main natural gas.

The fee for connecting the gas pipeline for objects of the first category is 20,000-50,000 rubles (clause 8 of the appendix to the order of the Federal Tariff Service of the Russian Federation No. 101-e / 3 of 04/28/2014). The exact price is determined by the local GDO according to the conditions in the given territory, but cannot exceed 50,000 rubles.

The second category of objects. Among the objects of the second category are households, the connection of which requires distribution gas pipelines and / or the creation of points for reducing the main gas. Their estimated gas consumption is higher than the norm for objects of the first category, a higher gas supply pressure is required (i.e. 0.6 MPa or more), etc.

Not a national treasure: how much does it cost to connect gas in the village
Compliance with the cost of connection for the first category is observed if the pipeline is inserted into a low-pressure gas main. If gas reduction is required, the connection price will exceed 50 thousand rubles.

In the private housing sector, objects falling under the second category usually have an area of ​​more than 300 m2.For their gasification, standardized tariff rates are applied, calculated according to the methodology developed by the Federal Tariff Service of the Russian Federation (Appendix to Order No. 101-e / 3 of April 28, 2014).

It should be noted that applicants for consumption volumes of natural or artificial gas from 300 m3/h and above are required to coordinate gas connections with the GDS, which has a technological connection with the contractor's gas pipeline.

Approval of the amounts of tariffs for connecting gas to households of the second category is made by the local executive authority REC (i.e. Regional Energy Commission).

The third category of objects. The capital construction objects of the third category include farms that need an individual gasification project. For them, the amount is determined according to the design and estimate documentation, which has previously passed the examination.

The amount of expenses for gasification for households of the third category is established by the REC, related to the location of the economy connected to the main gas.

Not a national treasure: how much does it cost to connect gas in the village
The prices for laying the gas pipeline along the section from the border entrance are not the same for different companies. However, it is worth considering the need for numerous approvals for the gas project. Full-fledged gasification will happen faster with an experienced contractor

The following conditions are considered to be characteristic features of the applicants' facilities in need of gasification:

  • planned consumption of natural gas from 500 m3/h;
  • work on connection to the gas pipeline requires the pipeline to be laid out through the forest fund, along rocky soils, swamps and water obstacles;
  • gas pipeline installation work requires passing through obstacles that force the use of horizontal directional drilling.

Those.According to Government Decree No. 1314, there are actually no rigid prices for the technological connection of applicants to the gas network. The cost of gasification works depends on a number of conditions that determine its size in the framework of the relevant methods of the Federal Tariff Service of the Russian Federation.

Calculation of the cost of gas connection

Works on connecting natural gas are divided into two groups of tasks - connecting the gas pipeline from the gas distribution network to the applicant's site and bringing the gas pipeline through the site to the consuming equipment.

However, the gas distribution organization (if it is permissible to connect the household to the gas pipeline) is only responsible for laying the gas pipeline to the border of the site.

The internal section of the gas pipeline is designed and built for a fee, and not necessarily by the same company that was engaged in bringing gas pipes to the site.

Not a national treasure: how much does it cost to connect gas in the village
PVC pipes marked with a yellow stripe can be used in the creation of low pressure gas lines. The only way to communicate with them should be underground

The amount required to bring the gas pipeline to the site for households of the first category will not exceed 50,000 rubles. For other categories, the cost of the gas pipeline withdrawal is determined by the calculation of standardized tariff rates according to the formulas specified in Chapter III of the Appendix to Order No. 101-e/3yu of the Federal Tariff Service of the Russian Federation.

As for how much it costs to lay a pipeline to supply gas through the site, the amount of the final cost depends entirely on the regional and territorial location of the household.

For example, the approximate composition and amount of the estimate for the installation of a gas pipeline from a border outlet to gas consumers inside a house in the Moscow Region are as follows:

  • Preparation of the design geo-baseline (site topography plan), its approval in state departments - 20,000-35,000 rubles.
  • Development of a gas supply project - 35,000-55,000 rubles. Its price depends on the pressure in the supply gas pipeline, on the number of gas-consuming equipment.
  • Coordination of the gas supply project - 15,000-30,000 rubles. This amount contains payment on the accounts of enterprises and services, whose approval is mandatory. For example, 5,000 rubles are paid to the regional architecture of the MSC, 5,000 rubles to the MOESK (electricity), and 4,000 rubles to Mosoblgaz. etc.
  • Registration of the project and its technical supervision in Mosoblgaz will amount to 5% of the amount of work on the installation of the gas pipeline.

Then there are construction and installation works according to the finished and agreed project, which determines their cost. For example, for a cottage with an area not exceeding 300 m2, the price of these works can be 165,000-250,000 rubles. depending on the complexity of the device and system connection.

Read also:  What to do if you need a kitchen hood

Calculation of the cost of connecting gas to household

Gasification of the house is a costly procedure. However, the difference in the cost of central heating from gas is significant. Soon, all costs will pay off. Connection tariffs are different: standard and special.

The standard tariff applies to houses that are located in the city and are no more than 10 meters from the main pipe, as well as for real estate that is located outside the city, but no more than 25 meters from the pipe. In all other cases, a special rate applies.

Please note! Important factors affect the total cost of the work:

  • local features of the relief;
  • how the pipe will be laid;
  • house structure.

On average, the owner will spend from 5,000 to 50,000 rubles on laying a pipe, and from 40,000 to 500,000 rubles on installing and purchasing equipment.

Calculation of the cost of gas connection

Works on connecting natural gas are divided into two groups of tasks - connecting the gas pipeline from the gas distribution network to the applicant's site and bringing the gas pipeline through the site to the consuming equipment.

However, the gas distribution organization (if it is permissible to connect the household to the gas pipeline) is only responsible for laying the gas pipeline to the border of the site.

The internal section of the gas pipeline is designed and built for a fee, and not necessarily by the same company that was engaged in bringing gas pipes to the site.

PVC pipes marked with a yellow stripe can be used in the creation of low pressure gas lines. The only way to communicate with them should be undergroundNot a national treasure: how much does it cost to connect gas in the village

The amount required to bring the gas pipeline to the site for households of the first category will not exceed 50,000 rubles. For other categories, the cost of the gas pipeline withdrawal is determined by the calculation of standardized tariff rates according to the formulas specified in Chapter III of the Appendix to Order No. 101-e/3yu of the Federal Tariff Service of the Russian Federation.

As for how much it costs to lay a pipeline to supply gas through the site, the amount of the final cost depends entirely on the regional and territorial location of the household.

For example, the approximate composition and amount of the estimate for the installation of a gas pipeline from a border outlet to gas consumers inside a house in the Moscow Region are as follows:

  • Preparation of the design geo-baseline (site topography plan), its approval in state departments - 20,000-35,000 rubles.
  • Development of a gas supply project - 35,000-55,000 rubles.Its price depends on the pressure in the supply gas pipeline, on the number of gas-consuming equipment.
  • Coordination of the gas supply project - 15,000-30,000 rubles. This amount contains payment on the accounts of enterprises and services, whose approval is mandatory. For example, 5,000 rubles are paid to the regional architecture of the MSC, 5,000 rubles to the MOESK (electricity), and 4,000 rubles to Mosoblgaz. etc.
  • Registration of the project and its technical supervision in Mosoblgaz will amount to 5% of the amount of work on the installation of the gas pipeline.

Then there are construction and installation works according to the finished and agreed project, which determines their cost. For example, for a cottage with an area not exceeding 300 m², the price of these works can be 165,000-250,000 rubles. depending on the complexity of the device and system connection.

Conducting gas in the regions

Remember! At the federal level, they refused to introduce benefits for the gasification of private houses. However, regional authorities have the right to establish subsidies and incentives for different segments of the population.

As a rule, the regional government of only more developed regions introduces preferential gas pipelines on its territory.

Not a national treasure: how much does it cost to connect gas in the village

An indulgence is being implemented in the form of compensation for vulnerable groups of the population, such as:

  • disabled people of the first and second groups, disabled children;
  • large and low-income families;
  • families with a disabled child;
  • veterans of the Great Patriotic War;
  • rear workers;
  • participants in various hostilities;
  • liquidators of accidents at nuclear power plants;
  • people who have been awarded government awards.

Not a national treasure: how much does it cost to connect gas in the village

A complete list of beneficiaries can be found in the territorial division of the social service in your region.

To receive compensation, you need to fill out an application in the form and attach documents confirming payment for gasification of a private house.

For example, in the Rostov region, the following can apply for payment for conducting gas to the house:

  • participants of the Great Patriotic War, invalids of the Great Patriotic War, as well as widows, widowers of dead disabled veterans of the Great Patriotic War;
  • persons who received the first and second groups of disability;
  • persons who survived the Siege of Leningrad, former residents and liberators;
  • rear workers;
  • families with three or more children.

You can get a discount of 50 percent of the total cost of gas. However, the payment is fixed at twenty thousand rubles. For example, if a large family spends 60,000 rubles when installing gas to a private house, then it will receive not 30,000, but only 20,000 rubles.

Important! You can only receive compensation once in a lifetime. To do this, write an application and send it to the territorial office of the Department of Social Protection of the Population

It should be accompanied by copies of documents that confirm payment for the purchase of equipment, work performed, as well as the status of a beneficiary.

In the Leningrad region, a new, different compensation policy has been introduced. It will serve as a good example for introduction in other regions of the country.

A certain amount of funds is allocated from the regional budget to compensate for losses to poorly protected sections of the population in connection with the gasification of a private house. 110 thousand rubles are allocated for beneficiaries, and 70 thousand rubles for ordinary citizens.

You can receive compensation if the owner has lived in the house for more than one year.This rule is designed to protect public spending when developers try to take advantage of money allocated to ordinary people.

Thus, the local administration compensates for almost all losses. The owner will spend 10-50 thousand rubles on gasification of equipment.

You can clarify information about obtaining benefits in the territorial division of the social service or in the local administration.

ATTENTION! View a completed sample utility subsidy application:

Not a national treasure: how much does it cost to connect gas in the village

ATTENTION! View the completed sample application for the provision of social assistance measures:

Not a national treasure: how much does it cost to connect gas in the village

Not a national treasure: how much does it cost to connect gas in the village

What to do if you are the owner of the house, but the land is not registered?

Required documents

For gasification of a private house, a package of documents should be collected. It is impossible to carry out blue fuel without them.

It includes:

  • documents confirming the ownership of this property;
  • technical passport for the house;
  • passport of a citizen of the Russian Federation, the owner of the house;
  • cadastral passport.

Gas can be carried only to the house. If there is nothing at the required place, then the pipe will be refused. However, it is allowed to conduct a network to country houses, cottages, country buildings, if all technical conditions are met.

The main condition for obtaining a permit for gasification of a house is the permanent residence of at least one person in it.

Watch the video. How to connect gas to a country house. Prices and terms:

Step-by-step instruction

Before starting all actions, you should contact the organization that carried out the gas shutdown for clarification of the list and sequence of actions to restore the connection.

The company will announce what is required from the debtor and in what time frame. Consider the sequence of actions.

Repayment of a debt

Payment of the amount of debt is a prerequisite for reconnection. If the debt is large, or the owner of the apartment does not have material support for a one-time payment, it is possible to draw up an agreement on paying the amount several times - in installments.

The amounts and terms of payments differ depending on the accepted terms of the agreement.

When determining the amount and frequency of payments, additional payments for connecting and disconnecting in-house (in-house) equipment and other technical work are taken into account.

In the usual case, they are paid to the gas supplier (resource supplying organization), but if a third-party company provides these services in a private house, you need to apply for a payment receipt from it. Additional payments can be made before connecting the gas or upon the fact of the action.

Applying

It is better to write an application for resuming connection to the gas transmission network directly to the supplier's organization. It is written in free form and includes a notice that debt obligations have been fulfilled.

The application should list the attached receipts of the repaid debt and paid disconnection/connection services. Attaching copies of expense documents, the application is submitted personally at the office of the company, or sent by registered mail.

Receiving confirmation of acceptance

When submitting an application, make sure to take a photocopy of it. The employee who accepted the paper endorses the incoming application, and on the copy puts down the date, the number of the incoming documentation, confirmation of the attached receipts.

You can immediately submit an application in two copies.

Application review

Government Decree No. 549 provides for a five-day period for consideration of the submitted application. The countdown of the period begins from the date of acceptance of the application, which is considered a written notice on the elimination of the reasons for the suspension of gas supply.

Service resumption

Since all the required amounts have been paid or secured by the concluded agreement, a visit from an employee of the resource supplying organization can be expected. Before reconnecting the gas, he will have to inspect the equipment for faults and compliance. normative service life.

Attention! If the condition of the devices is in doubt, the employee may refuse to resume gas supplies, citing the need to diagnose or replace the equipment

2 Connection price and benefits

From 01.03.2014 new rules for connecting residential buildings to the gas distribution system are in force. They contain the old norms and changes have been made that relate to the timing of work and cost. Thanks to this, the connection has become more profitable, takes less time.

Prices vary, depending mainly on the remoteness of the object, but on average you will have to pay:

  • for filling out an application, obtaining a permit and primary documents - from 8 to 50 thousand rubles;
  • the production of the project will cost 3-20 thousand;
  • laying a pipe from the main to the facility - 2-5 thousand per meter;
  • tie-in to the gas pipeline - from 10,000 to 15,000 rubles;
  • a readiness check by technical supervision costs an average of 2,000.

In the regions there is a significant fluctuation in prices. For example, in the Moscow region it is 400-500 thousand for all work. The cost is determined by the distance from the capital.In the Leningrad region, 300 thousand rubles are enough, and in the Nizhny Novgorod region - 150-200 thousand. Cheapest of all gas pipe in a private house will cost in the European part of Russia, an average of 100 thousand rubles. Beyond the Urals, the situation is somewhat different; many settlements are located at a considerable distance from industrial centers and gas pipelines.

Not a national treasure: how much does it cost to connect gas in the village

The region of the Far East, where there are very few highways, is problematic in this respect. Even if the main pipe is nearby, for tie-ins in the gas pipeline an amount less than 200 thousand cannot be calculated. Equipment is imported from nearby foreign countries, which affects prices. The diversity of the climate also prevents the application of standards that are used in other regions.

There are many benefits in Russia, but at the state level they do not apply to gasification. The federal government transferred this right to the local. In the regions, first of all, veterans of the Second World War, the disabled, combatants, single mothers (fathers) receive financial assistance for connection. The Leningrad region can be cited as an example: here 70,000 rubles are allocated from the budget for ordinary citizens, and 110,000 rubles for beneficiaries.

The presidential program plays an important role in rural areas. It provides:

  • construction and reconstruction of gas distribution networks;
  • the use of energy-saving technologies for installation;
  • increasing the efficiency of the use of natural resources.

Companies are guided by federal law, the percentage of residents covered by gasification is increasing. The new rules provide for the possibility for rural residents to submit a collective application for the installation of pipes from the main to the plots. If it is satisfied, the supply to the settlement is free of charge.Property owners connect to the network at their own expense.

Benefits for gasification of a private house

Currently, unprotected segments of the population can apply for preferential gasification at home.

These include:

  • invalids of the first and second groups;
  • WWII veterans;
  • combatants;
  • large and low-income families;
  • mothers, single fathers;
  • parent of a child with a disability.

However, these categories of people should not count on preferential gasification of a private house. Bringing communication networks to housing is paid at the general rate.

Benefits apply to utility bills. Thus, once the system is up and running and you have to make monthly payments for the use of resources, the total amount payable is reduced.

Rating
Website about plumbing

We advise you to read

Where to fill the powder in the washing machine and how much powder to pour