How to transfer a gas meter: rules and procedures for transferring a flow meter

Transferring a gas meter in an apartment

Work order

Professional teams spend no more than an hour transferring or installing a gas meter in an apartment. First of all, the gas supply is turned off in the house. This is done in agreement with local utilities, with a warning to other residents.

Further actions are as follows:

  1. With the help of gas welding, the device is removed.
  2. The gas pipes are being transferred in accordance with the new scheme.
  3. The device is installed in a new location.

At the end of the work, representatives of the gas service should check the tightness of the connections.To do this, gas is launched through the riser, and soap suds are applied to the joints.

The absence of bubbles indicates a good connection. The appearance signals a leak. In this case, the gas is blocked, the seams are welded again.

How to transfer a gas meter: rules and procedures for transferring a flow meterIt is necessary to prepare a working space for the visit of gas workers: ensure the availability of gas equipment and pipes, move the curtains, remove kitchen utensils, foreign objects

Flange connections are re-tightened. Simultaneously with the control of leaks, the operability of the device is checked.

Installing a new instrument during migration

The transfer of the flow meter can be combined with the replacement of the device with a new one. This is beneficial for:

  • approaching the end of the life of the old meter;
  • desire to install a modern device with remote data transmission;
  • the absence of documents confirming the positive outcome of the last verification.

Returning the old device for verification, you will have to spend time waiting for the provision of the service and money to pay for it.

If the equipment is found to be unusable, the costs will increase: it will be necessary to purchase a new meter. Therefore, in some cases, when transferring, it is more profitable to schedule the installation of a new device.

Acceptance, accompanying documents

Being present during the work, the owner can check the correct installation and compliance of the new arrangement of pipes and the meter with the approved scheme. If everything is done correctly, the masters must fill out an act of work performed.

It specifies:

  • information about the gas distribution organization that issued the permit and sent its representatives;
  • information about the employees who performed the work;
  • technical data of the meter, its serial number.

The second required document is the act of putting the device into operation. It should record the date and time of launch, confirm the device's operability.

How to transfer a gas meter: rules and procedures for transferring a flow meterWhen applying for a meter transfer, ask the gas company if it is possible to seal the meter immediately after installation. Some organizations provide this opportunity. In others, a separate application must be submitted after completion of installation work.

Both acts are drawn up in two copies. The owner of the premises must keep his copies together with the technical passport of the product.

Placement of a filling after transfer

After you managed to transfer the gas meter in the kitchen, you need to seal it. To do this, you need to fill out an application and take it to the customer service department.

The following documents will be required at the time of application:

  1. Passport of the applicant, certificate of ownership.
  2. Technical passport of the product or its copy.
  3. Acts drawn up by the masters of the gas company during the transfer.

The period allotted for the installation of the seal is 5 days. During this time, the company is obliged to agree and determine the date of the specialist's visit, perform the work, and prepare a service contract.

How to transfer a gas meter: rules and procedures for transferring a flow meterAfter transferring the meter and sealing it, it is necessary to record the readings. The data must be documented. This rule applies to both new devices and already used ones.

accrual payment by meter conducted from the day following the date of sealing. Up to this point, when calculating expenses, the consumer should be guided by regional and seasonal regulations.

Transferring a gas meter in Mogilev's apartment

Attentive, tactful and qualified staff will carry out a quick and high-quality selection of options for buying, selling, exchanging, will help in privatization and further sale, will ensure the security of mutual settlements, will help with the redevelopment and reconstruction of your home.

Gogol and st. There is no bathroom, only a shower in a separate room. Warm, Not Angular, There Is A Glazed Balcony, Water Meters, Double Entrance Door. The repair is normal, the windows are not PVC. Contact person: Natalia Electr. One-room apartment, sale or exchange One-room apartment, sale or exchange One-room spacious apartment, sale or exchange. The apartment has an improved layout, not a corner apartment, I will sell it or exchange it for a summer house, an additional payment in both directions if necessary. In an ecologically clean and quiet residential area of ​​​​Shaman Lakes, nearby: shops Martin, Perekrestok, etc.

Reasons to move the device

How to transfer a gas meter: rules and procedures for transferring a flow meter
The main factors for changing the location of the meter and related equipment in an apartment building are:

  • obstacle in redevelopment;
  • installation of new furniture;
  • security enhancement.

Removing the counter to the landing will allow you to complete the desired finish or place decor items. It is also possible to place the device in a hidden way without changing the location. It will not be difficult to complete the task by choosing a very compact electronic meter. This will not violate the technical requirements.

If the meter is initially located in the corridor of the apartment, then new furniture may become the reason for its movement. For example, the wall in the hallway. The counter and traffic jams are a significant obstacle that can be moved.

This will be a more profitable option from a financial point of view than the individual fitting of furniture.Very often, the point of placement of the device is located in such a place that it is simply impossible to pick up furniture or fit it.

How to transfer a gas meter: rules and procedures for transferring a flow meter

In this case, the indications should be easily read by the controller.

If the wall is load-bearing and made of reinforced concrete, then hiding the device will be problematic and expensive. Therefore, most often they resort to choosing a different location for the counter.

Regular shutdowns due to the theft of circuit breakers or simply a power outage can be a reason to move the device from the entrance to the corridor of a privatized apartment. In this case, it is necessary to foresee the placement in advance so that even rearranging the furniture does not become a problem.

How to transfer a gas meter: rules and procedures for transferring a flow meter

The modern model takes up a minimum of space and an ergonomically designed plastic shield will do.

If the meter in the entrance is induction, from the last century, then it is better to replace it. At the same time, sometimes even such owners of the apartment leave. The motivation is simple - cost reduction.

They only resort to replacing plug-type switches with more modern automatic ones. They are also transferred to the corridor of the apartment. This allows you to exclude access to them by unauthorized persons. On the other hand, this approach cannot be considered a complete solution.

How to replace a gas meter advice from the masters. It is not allowed to replace a gas meter on your own.

If you need to replace the gas meter, we will advise you on how to replace the gas meter. For this purpose, gas meter adapters can be used, which are simple and do not require welding. These devices greatly facilitate the installation of gas meters. Depending on the model of the gas meter, replacement is done in different ways. There are two options for connecting adapters for gas meters - 92mm and 100mm.

Read also:  Insulation of steel gas pipelines: materials for insulation and methods for their application

The woman who called the editorial office excitedly announced that she would soon have to change her home gas meter, and she heard that it costs almost fifteen thousand rubles. How much does it really cost to replace a gas meter? With this question, we turned to the head of the service of house networks of the branch "Trust" Aleksandrovgorgaz "OJSC" Vladimiroblgaz "Igor Valentinovich Fedorov.

Each gas-using equipment, which includes a gas meter, has a period during which it is operated. As a rule, it is 8-10 years. That is, the meters that were installed in 1996-1999 have expired and must be replaced. The subscriber service of OAO Vladimiroblgaz, represented by the head Alexander Nikolaevich Markov, is working to notify of the need for these works. Subscribers can either change the meter to a new one, or remove the installed meter and send it for examination to the laboratory, which is located in the regional center at Vladimiroblgaz OJSC. There, the meter is checked and a conclusion is issued on the further possibility of its operation. Verification takes an average of two to three weeks. During this time, payment for the consumed gas will be charged according to the heated area.

But, as a rule, the bulk of the population still decides to purchase a new gas meter. Replacing the gas meter is fully justified. To do this, you need to obtain a certificate of no debt, which can be obtained at the subscriber department on the street. Lenina, d.8. Then you need to invite the employees of the VDPO (Sovetsky lane, 26), who are engaged in the inspection of chimneys and ventilation ducts.They go to the place at the request of the subscriber, inspect the chimney and issue a conclusion. With the conclusion and certificate, the subscriber comes to Aleksandrovgorgaz (Kommunalnikov St., 2) and writes an application to replace the gas meter. In the VET they raise archival documentation and carry out a replacement. Replacing a gas meter with a similar one costs 1579 rubles. If a person cannot find a similar counter, welding work is carried out. The cost in this case will be 3.5 thousand rubles. The counter itself in the store, which is located at Aleksandrovgorgaz, costs an average of 1,300 rubles.

To replace the counter, its location plays an important role. Installation can be carried out from different sides, both to the right and to the left or in front of the gas pipeline.

For example, the adapter for gas meters 100-A110 F is designed to replace rotary meters with a height of 100 mm without the use of welding.
Adapters fully comply with the requirements of the documentation and can be used for their intended purpose.

Gas meter replacement

The cost of gas meters, depending on the characteristics, varies between 1000-13000 rubles. The volume of gas consumed must not exceed the nominal volume of gas that can pass through the meter.

Each meter undergoes initial verification at the factory. And it is from this moment that the period of its next verification is counted, which can be 4-12 years and is indicated in the passport.

When installing a gas meter by the gas service, seals are installed on the meter.

After the expiration of the meter verification period, it is necessary to contact the gas service for its dismantling and subsequent verification in the laboratory.

The cost of verification, depending on the meter model, ranges from 1200 to 2700 rubles.

In case of unsatisfactory verification results, the gas service dismantles the device and replaces it with a new one at the expense of the customer, followed by sealing.

Reasons for replacing gas meters

– Incorrect installation of the dust filter or incorrect selection of the size of the cells, resulting in a blockage of the system;

– The meter passes gas with a high moisture content;

– The volume of gas passing through the meter is much higher than the nominal norms for this type of meter;

– The meter was initially installed incorrectly and a complete replacement of the gas meters is required.

gas meter scheduled replacement of a gas meter How to replace a gas meter - tips from the masters. It is not allowed to replace a gas meter on your own.

Popular models of gas meters for an apartment

We tried to compile for you a certain rating of gas meters available and popular in Russia. The models of gas meters presented in it have been on the market for a long time and have already proven themselves.

VC (G4, G6)

Membrane gas meters of this brand have proven themselves well in the gasification of private houses. But they are also suitable for installation in apartments, if gas boilers are used for their heating. There are many modifications, we are only interested in two:

  • G4
  • G6

There are left and right modifications. They work at temperatures from -30 to +50. Withstand pressure up to 50 kPa. Thanks to their sealed housing, they are perfect for outdoor installations, even without protective cabinets. Calibration interval - 10 years. Service life - 24 years. Warranty - 3 years.

Grandee

Grand is an electronic small-sized gas meter widely used in Russia.

It is found in the following modifications (the numbers indicate the throughput):

  •         1,6
  •         2,3
  •         3,2
  •         4

Models are available with thermal correctors and special outputs for remote data acquisition. Mounted on horizontal and vertical pipes. Thanks to the robust housing, it can be installed outdoors. The verification period is 12 years. Service life - 24 years.

CBSS (Betar)

Betar meters are silent, do not vibrate, do not interfere with radio devices. These meters are mainly installed inside heated rooms, since their operating range is between -10 and +50 °C. They are easy to install due to their dimensions of 70x88x76 mm, weight of 0.7 kg and the possibility of installation on both horizontal and vertical gas pipes. Due to the presence of union nuts with 1/2 thread, installation is carried out without welding and other connecting elements.

The device is electronic, a lithium-ion battery is used as a power source, the service life of which is 5-6 years. The service life of the device itself is 12 years. Working pressure - 5kPa

The SGBM counter can be purchased in the following modifications (the numbers indicate the throughput):

  •         1,6
  •         2,3
  •         3,2
  •         4

There is a built-in "Calendar" function - it allows you to record the moments of power failure during the operation of the meter. Additionally, you can order a meter with temperature correction. It will take into account the ambient temperature and bring it to a temperature of 20 ° C. That will allow you to take into account the volume of gas, regardless of external conditions. It is possible to equip the BETAR meter with a pulse output for automatic remote collection and transmission of readings.

SGM

SGM is an electronic device for measuring the flow of natural or liquefied gas. Differs in small dimensions (110х84х82) and weight 0.6 kg.The case is sealed and resistant to mechanical damage. Installation on a vertical and horizontal pipe is possible. The scoreboard is turning. There is a modification with a pulse output for connection to an external accounting system.

Read also:  Gas burner for soldering copper pipes: main types of burners + tips for potential buyers

SGM brand models:

  •         1,6
  •         2,5
  •         3,2
  •         4

For autonomous power supply, the device has a lithium battery of “AA” class. The maximum pressure is not more than 5 kPa. Mounted with union nuts with 1/2 thread. The counter works at temperatures from -10 to +50. Calibration interval - 12 years. Manufacturer's warranty - 12 years.

It is possible to order a version with an impulse transmitter for remote transmission of gas flow readings.

SGK

Membrane meter made of sheet steel. Works at temperatures from -20 to +60. Thread fitting M30×2mm. There is left and right handed. The maximum working pressure is 50 kPa. Dimensions - 220x170x193, weight - 2.5 kg.

The following models are available, differing by numerals that indicate the nominal gas flow rate.

  • SGK G4
  • SGK G2.5
  • SGK G4

The service life is 20 years, the interval between verifications is 10 years.

Arzamas SGBE

Household electronic meters of the Arzamas brand are available in two versions:

  •         1,6
  •         2,4

The device is compact, without moving parts, reliable, lightweight and durable. Easy to install. It is powered by a lithium battery, which lasts for 8 - 12 years. Service life - 24 years.

Gasdevice NPM

The NPM membrane meter differs by models:

  • G1.6
  • G2.5
  • G4

Available in left and right hand execution. Works at temperatures from -40 to +60.It has standard dimensions for membrane devices 188x162x218 and a weight of about 1.8 kg.

The period between verifications is 6 years. Service life - 20 years, warranty - 3 years.

Rules for installing new meters

Given the ambiguous operating conditions of the devices, gas meters, including "smart" designs, are subject to appropriate placement standards in relation to other gas appliances and installation rules (requirements).

How to transfer a gas meter: rules and procedures for transferring a flow meter
The procedure for installing a device for monitoring the volumes of domestic gas consumed is traditionally accompanied by the implementation of relevant norms and rules. For smart modern meters, these rules are easily enforced.

In particular, for a device manufactured by Technomer, the requirements look like the following:

  1. The device should be mounted inside closed utility rooms, in extreme cases - on the street under a specially equipped canopy. The meter must be reliably protected from direct sunlight and precipitation.
  2. It is allowed to mount the device on pipelines laid both vertically and horizontally, it does not matter at what angle the installation is performed.
  3. If the installation is done on a section of a horizontal or vertical pipe, the direction of gas flow through the meter can be ignored. That is, the device can be placed in any position in the direction. However, the manufacturer recommends following the direction according to the pointer on the meter body.
  4. It is unacceptable to install the meter at the lowest points of the gas pipe, since in this installation option there is a danger of condensate accumulation.
  5. If control samples show the presence of water in the household gas, the control meter must be mounted on a vertically located pipeline, choosing the direction of flow from top to bottom.

When providing for the installation at a specific location of a new gas meter in apartments, it is necessary to ensure the protection of the meter from possible shocks, vibrations, and other mechanical influences.

Also, in the case of transferring the flowmeter, one should not forget about the approved transfer rules.

How to transfer a gas meter: rules and procedures for transferring a flow meter
A smart gas flow meter from the "SMT Smart G4" series of devices and points of post-installation "registration": 1 - the point of attachment of the seal of the organization conducting the verification; 2 - point of attachment of the control seal of the organization supplying gas to the consumer; 3 - point of sealing the inlet fitting of the device

Mounting requirements do not stipulate a specific value of the nominal diameter of the pipe, as well as the rules for maintaining the alignment of the flowmeter nozzles and pipes. Also, there are no specific requirements for the degree of roundness of the pipes, the presence of ledges at the junction points of the meter with the gas pipe.

Transfer of gas equipment

The counter can be lowered, our neighbors did this, below the level of the table. And you can also move the boiler, you can also place it above the counter, but then you need a competent master to compactly place all the wiring from the boiler in a small area.

P.S. on the plan is the approximate location of the kitchen, if you do not work on rebuilding the gas. At the entrance to the kitchen there is a refrigerator and a sink, then a “peninsula” with a two or three burner stove and an oven (opposite the sink), the rest is a work surface. At the window there is a table + chairs and outside the door to the balcony there is a sideboard for dishes. Maybe there are other options for the location of the kitchen set?

Precautionary measures

It is very important to remember that you should not try to move or install the meter yourself. This poses a threat not only to health, but also to the lives of people around. Moreover, those who have shown initiative in this economy are subject to punishment in the form of a fine.

Moreover, those who have shown initiative in this economy are subject to punishment in the form of a fine.

After the work carried out by specialists, it is required that more attention be paid to the operation of the meter for some time

If the consumer uses gas metering devices without temperature compensation installed outdoors, the readings of these metering devices are used in gas calculations using temperature coefficients approved by the Federal Agency for Technical Regulation and Metrology.

Replacement of gas meters. Rules for the installation and transfer of gas meters.

As a rule, the question of replacing a gas meter arises when the period for its state verification begins to expire.

Basically, there is nothing complicated here, but there are rules for installing gas meters that cannot be deviated from. How to replace a gas meter?

First of all, you need to know that a gas meter is not considered a gas-using device, but it is an in-house gas equipment.

All work on the installation, repair, replacement of this equipment is carried out only by specialized organizations. All specialists of these organizations are trained and have access to gas hazardous work. Thus, it turns out that the transfer of the gas meter cannot be performed independently.

How you can replace a gas meter and not break the rules, only representatives of the gas supplier can tell.

In order to avoid all sorts of mistakes, as soon as the next deadline for checking the gas meter approaches, you should clarify with the organization that provides you with gas the procedure for carrying out this procedure.

It will be correct to submit an application for the replacement of equipment to an organization that performs control of in-house gas services. Then notify the one who will perform the services the time and date of the meter replacement, and also insist that he be nearby at this time.

Read also:  How to clean a geyser: ways available for self-implementation

You will need to control the performer so that he writes off the readings of the removed and installed meters, as well as to seal the meter.

If you insist on the presence of the controller when replacing the meter, you will exclude any possibility of various disputes arising from the readings of the removed meter, its serviceability and the fact that the gas service seals were intact at the time the meter was removed.

If the seal on the new meter has not yet been installed at that time, then the service provider is obliged to send his representative no later than 5 working days to seal the meter.

Gas meter transfer

You can also use the replacement of the counter when moving it to a completely different place. So, when the meter was installed on the street, and in winter, due to snow drifts, it became inconvenient to take its readings, in this case, it is necessary to make changes to the gas supply project, and install the new meter in another convenient place.

In order to carry out the transfer of the meter from the street to a warm room is evidenced by the fact that the meters that were produced for installation outside will cost much more than meters for installation inside.

Naturally, you can do the opposite: move the meter from the house to the street so that a not particularly attractive device does not spoil the general view.

For all owners of cottages or private houses, installing a gas meter involves certain expenses. In order to do everything right, you need to put a lot of effort.

First of all, you need to choose the right counter. To date, there are a huge variety of models, each model has its own price.

It should be noted that the time when energy resources were issued according to the standards has long passed. The current legislative acts have determined firm rules for equipping all premises where utilities are received with metering stations.

Of course, all utilities, without exception, are subject to accounting, including gas.

Great attention is mainly paid to three resources: electricity, gas and thermal energy.

Gas meter replacement

Each gas equipment to which the meter belongs has a period during which it is operated. Basically, this period is from 8 to 10 years.

Thus, all meters that were installed back in the 2000s have expired and need to be replaced. But there is an option in which you can remove the old counter and send it to the laboratory for examination. There, the counter will be checked and a conclusion will be issued on whether it can be used in the future.

Checking the meter takes two to three weeks.For the period while the meter is in the laboratory, payment for the consumed gas will be charged according to the heated area.

Conclusions and useful video on the topic

With the advent of long flexible pipes, the transfer of an internal gas pipeline has become less relevant, but in some cases you still have to contact the gas service. The most common reasons for calls are in the presented video.

Secrets of masking gas pipes:

About pipe and faucet transfer:

Welding work and meter transfer:

Finally, about the consequences of the illegal transfer of gas pipes. If you yourself plan to cut off a piece of a gas pipe or connect household equipment, you should be aware of the administrative and criminal penalties.

The minimum fine for unauthorized work is 2,000 rubles, and if a person suffers as a result of improper work, then a term of up to 5 years in prison is threatened.

We invite everyone interested in the issue of transferring a gas pipe in an apartment to leave comments and ask questions. The contact form is located in the lower block.

Good evening everyone! Please tell me where to start and how to get around the bureaucracy for transferring a gas double-circuit boiler in a new building to an adjacent wall. Delivery of the house is scheduled for the 4th quarter of the current year. The developer managed to place a gas boiler, in our opinion, very inconvenient. Having talked today with the manager of the developer, I realized that until the imminent delivery of the house, they will not be able to help in any way in terms of transfer. Everything falls on our shoulders from the moment we receive the keys. Questions:

  1. Is it generally legal to hang gas boilers on a wall with a chimney?
  2. Will it be very problematic to move the same boiler nearby, to the same corner on the adjacent wall (I attach the photo)?
  3. Do you need a separate project?
  4. Where to begin?
  5. How much cash will we have to say goodbye to?

How to transfer a gas meter: rules and procedures for transferring a flow meter

  1. Quite. In many houses, gas water heaters and boilers hang just like that.
  2. Technically, no problems! I just don’t see the gas pipe, haven’t you done it yet? Where should it be according to the project? And the meter is not in the same place where you want to put the boiler?
  3. In theory, no. Changes are simply made to the existing one (and that is unlikely). Start with where the gas pipe will be and agree with the installers to do it as you like.
  4. This is a very difficult question, and it is unlikely that anyone will answer it even roughly. Well, if only someone specifically here undertakes to re-solder the pipes and announces the price (I would transfer a thousand for 3-4 for work), then business.

Megavolt, thank you, you reassured me a little. They just scared me from all sides that everything related to gas boilers and columns - transfers, projects, etc. results in a hassle that can last for a very long time. And we really want to move as soon as possible. As for the gas pipes, they haven't hung them yet. But it will be right there, right from the boiler, above and into the chimney hole. Regarding the location of the future bill, the representative of the developer could not give me a clear answer.

Another question has ripened: should I definitely do the transfer of the boiler, agreeing with the hot gas? Or can I through the company with which the developer worked? Or even privately?

Go to the organization that will take the boiler into operation, and they are 1, 2, 3. Each city has its own organization, its own bosses, and there may be some special cockroaches.

I also agree with this. But in most cases there are no problems. I was also scared that installing a boiler instead of a column is not realistic, and if it’s real, it’s expensive, dreary and half a life of nerves. but for half a year now the boiler has been standing. The installers did not complete the input according to the project.To the question: “then you won’t find fault?” - “no one will look at your project anymore!” And there is. when making changes to the gas region, they simply changed the CONNECTION DIAGRAM, replacing it with a sheet from the available standard connection diagrams, and manually entering the boiler brand into it. At start-up, the gasman was not at all concerned about the question of the conformity of the location of the instruments, but only the correctness of the scheme and the materials used.

Rating
Website about plumbing

We advise you to read

Where to fill the powder in the washing machine and how much powder to pour