How to gasify SNT: the subtleties of connecting garden houses to the gas main

Presidential Program for Gasification of a Private House in Rural Areas

Main stages of gasification

Before conducting gas to a private house, you will need to find out which organization the main gas pipeline device belongs to, to which it is to be connected.If there is no information, you must contact the local authorities in your region and make a request for information on where you can get all the technical conditions.

Paperwork

How to gasify SNT: the subtleties of connecting garden houses to the gas mainAt the first stage, the number of devices that will be connected to the gas pipeline is calculated

To implement a new project with the installation of a gas pipeline and the issuance of technical specifications, a complete set of documents must be available. Their main list includes the calculation of the maximum gas consumption per hour, which they calculate independently or entrust this task to the designer. This procedure is relevant for buildings that are included in the category requiring additional heat calculations. In addition, they write an application for the provision of services, which indicates personal information about the applicant and the estimated time frame for putting the building into operation, if it is still under construction.

Design

How to gasify SNT: the subtleties of connecting garden houses to the gas mainAfter the design, the installation of pipes is carried out

After receiving the technical specifications, the owner will have to choose a company that will prepare the project and the network for connection, as well as supply gas to the house. It is worth contacting organizations that have permission to carry out construction and installation work, as well as the creation of projects for gas supply of external and internal types. There you need to provide a copy of the technical passport for the house, the topography plan of the site, the documentation for the boiler and appliances, as well as the received specifications.

When the contract is concluded, a designer will be sent to the owner to carry out the necessary measurements. After drawing up the project, it will need to be approved by special organizations, including the water utility, the highway and others. Project and situational plan of the land the site for gasification, together with the contract, is submitted for connection to the gas company, where it must be sent to work after 14 days or returned for revision and approval.

Construction of a gas pipeline

At the stage of installation of the gas pipeline, an estimate is made, then an agreement is signed, which indicates the deadlines, as well as other details. The tie-in of a pipeline element into the main gas pipeline must be carried out by employees of the gas service. Their task is to bring and route pipes from the main to a specific area, connect to a common system, connect gas, check pressure and test run. After opening a new branch valve, a suitable operating mode for the devices is set, their operation is checked and an operational briefing is given to the owner of the building.

Service Agreement

How to gasify SNT: the subtleties of connecting garden houses to the gas mainAfter all gasification works, a service contract is drawn up

Gas is connected to each private house after signing a standard service contract. It indicates information about the residential building, the type of devices and what is included in the list of available services. Its cost depends on the number and type of gas appliances that are installed in the house, the fee for them consists of the prices for each unit.

Contract for consumption

A standard consumption contract is concluded with the managing organization responsible for the supply of gas. It is necessary to account for fuel consumption and its cost, to regulate relations between the owner and the company. It lists the rights and obligations of the subscriber and supplier, and also indicates the sequence and frequency of use of the main pipeline and gas supply.To draw up and conclude such an agreement, it is enough to contact the municipal company.

Gasification of the house with a gas tank

If there is more than a hundred meters from the house to the gas main, or it is impossible to connect to it at all, then the only option left is to install it on the gas tank site. This is a container for pumping and storing gas, from which it enters through a pipe directly into the cottage to the boiler or stove.

How to gasify SNT: the subtleties of connecting garden houses to the gas mainThe main advantage of a gas tank is a minimum of time for approval and installation, all work on gasification of a house can be carried out in just a couple of days, there is no need to obtain technical conditions here (+)

If the installed gas tank has a capacity of up to 10,000 liters (which is more than enough for most private houses), then it is not required to obtain technical specifications or other permits for it. All projects and documents will be provided by the company that will carry out its installation.

This capacity itself costs a lot of money, but if there is no opportunity to connect to the highway, then the gas tank is a good replacement for it. Usually, its volume is calculated in such a way that refueling should be carried out two or three times a year. Otherwise, such a gas supply system to the house does not differ from the option considered above. The same sensors, valves and gas supply pipe.

The strengths and weaknesses of connecting a private house to a gas tank and a gas main are thoroughly analyzed in our article.

The end of gasification (gas connection to the house) is also an important stage

At the final stage of gasification of the house, it remains to be instructed on the safe use of gas equipment, conduct a trial run, and conclude an agreement for seasonal maintenance of the system.If a gas tank is installed, then it is necessary to conclude an agreement for systematic gas supplies.

The last "touch" is to give the project documentation (or an approved copy) for safekeeping in the archive, in case later redevelopment is needed or any clarifications are required.

Video description

Visually about the progress of work and the cost of gasification at home, see the following video:

What has changed in the rules for gasification of a private house

Until 2016, it was quite difficult to even approximately predict how much it would cost to connect gas to a private house, as there was no legislative regulation and control. This led to the fact that monopolists could single-handedly set the timing of gasification and its cost. But, with the adoption of new laws, the maximum time for gasification was limited to one and a half years.

The cost and timing of the approval and implementation of a gasification project for a private house are now regulated by law. This means that the party ordering the services can now take a more active part in the control of work and demand their timely completion.

Video description

What other questions arise about the cost of connection, described in the video:

Conclusion

Although gasification of a private house is a long, tedious, and expensive process, its importance cannot be overestimated. Everyone who has the opportunity to gasify their homes does it first of all, especially since with the adoption of new laws, the population has the opportunity to predict the timing of the work.

Read also:  How to arrange heating of a private house without gas: organizing a system in a wooden building

Legislative regulation

Various relationships in society are governed by law, legislators consider various situations, develop provisions within which citizens must act.

Details about it:

  1. The Civil Code of the Russian Federation states in the article that a partnership is created by a voluntary association of property owners, in particular, it includes residential buildings, summer cottages, gardens, vegetable gardens located in summer cottages that are in common use.
  2. The Civil Code of the Russian Federation in the article shows that in a partnership created not for commercial purposes, the owners of their property are on the basis of shared ownership.
  3. Federal Law No. 66 regulates issues regarding associations in the field of dacha farming among gardeners and gardeners.
  4. Federal Law No. 69 determined for non-profit organizations with technical capabilities the procedure for concluding contracts with gas suppliers and becoming a full-fledged consumer.
  5. The Civil Code of the Russian Federation in Article 218 indicated that members of non-profit societies will have to build a gas economy with their own funds.
  6. The Civil Code of the Russian Federation, in Article 209, ordered the conditions for registering the gas facilities as property, after which the owners can own, use and dispose of.

Civil Code of the Russian Federation Article. Basic Provisions on the Association of Real Estate Owners

Civil Code of the Russian Federation Article. Property of the Association of Real Estate Owners

Civil Code of the Russian Federation Article 218. Grounds for acquiring property rights

Civil Code of the Russian Federation Article 209. Content of the right of ownership In addition to the right of ownership, the owner of the gas transmission system bears the burden and obligations of security and rescue measures with the involvement of specialized services.

Advantages

Information about how much a plot for the construction of a residential building in the Moscow Region costs stops many from wanting to become the owner of a cottage. But in order for the family to have its own garden, garden, dacha, you can use other options, for example, join a garden cooperative.

Houses are being built on the territory of the garden plot, in which you can live not only in summer, but also in the cold season. To fully provide such a room with the necessary living conditions, you only need to conduct gas:

  • Heating with it in the country, in the garden house will be safer compared to heating with wood, coal.
  • A gas boiler is more convenient to use, it heats the room faster.
  • It is more convenient to cook food on a gas stove.

If you bring gas to a plot with a private house, the problem of constant search and delivery of solid fuel is solved. But the principle of operation of a garden non-profit partnership differs from the principle of a dacha cooperative or a village.

Therefore, the question of how to gasify a private house in SNT is difficult, as is the registration of country houses. The garden house, according to the rules, does not imply permanent residence.

How to gasify SNT: the subtleties of connecting garden houses to the gas main

You should immediately tune in to the fact that the gasification process will be lengthy, complex, with many obstacles to be overcome, including bureaucratic ones. Significant assistance in this case can be provided by an experienced lawyer who will accompany this case throughout its entire length.

If a plot in a garden cooperative is registered as a property, gasification will significantly increase its value. A house with high-quality heating, hot water can be considered as a full-fledged housing that can be used all year round.

Connecting gas on your own to a private house (plot)

In this article, we will consider centralized gasification, and not autonomous (in which gas comes from gas tanks that are located on the site).

How to gasify SNT: the subtleties of connecting garden houses to the gas main

The procedure for connecting to the gas distribution network occurs in several successive stages:

1. Submission of a request to the gas distribution organization for the issuance of technical conditions for the gasification of the house. The request contains the following information: information about the applicant (full name, place of residence, postal address, telephone number), planned maximum gas consumption per hour.

The following documents are attached to the request:

  • A document that confirms the identity of the applicant.
  • Copies of land documents.
  • Situational plan of the land plot with reference to the terrain.
  • Calculation of the planned gas consumption (not needed if the estimated consumption is less than 5m³ per hour).

Important! The gas distribution company must send technical specifications within 14 days, or within the same period provide a reasoned refusal to do this (due to the impossibility of connecting gas). 2. If the technical conditions suit the owner, he sends a statement to the gas distribution company about his desire to conclude a gas pipeline agreement

By the way, this can be done immediately by omitting the first item if gas consumption is less than 300 m³ per hour, and the owner knows the connection conditions well

If the technical conditions suit the owner, he sends a statement to the gas distribution company about his desire to conclude a gas pipeline agreement. By the way, this can be done immediately by omitting the first item if gas consumption is less than 300 m³ per hour, and the owner knows the connection conditions well

2.If the technical conditions suit the owner, he sends a statement to the gas distribution company about his desire to conclude a gas pipeline agreement. By the way, this can be done immediately by omitting the first item if gas consumption is less than 300 m³ per hour, and the owner knows the connection conditions well.

Country passions: 5 most pressing issues of 2018

This application shall contain information about the applicant, the name and location of the facility, the planned gas consumption, the number and date of issue of the previously received technical specifications.

The following documents are attached to the request:

  • A document that confirms the identity of the applicant.
  • Copies of documents for the land or house.
  • Situational plan of the land plot with reference to the terrain.
  • Topographic map agreed with the operating organizations (scale 1:500, all aboveground and underground structures should be indicated on it).
  • Calculation of the maximum gas consumption per hour (if it is less than 5 m³, you can not attach it to the documents).

Important! The gas distribution organization must provide two copies of the contract within 30 days. As well as updated specifications. The owner of the plot (house) also has 30 days to sign the contract and send one copy back

The owner of the plot (house) also has 30 days to sign the contract and send one copy back.

3. The applicant pays for all necessary work - in accordance with the schedule specified in the contract.

4. After that, measures for technological connection are carried out - both on the part of the gas distribution organization and on the part of the applicant.

5.The final stage is the signing of acts on connection, on the delimitation of property, on the delimitation of the operational responsibility of the parties.

How to conduct gas in SNT?

To achieve gasification of the house, a general meeting of members of the partnership is held. If the majority of the owners voted in favor of conducting gas to their dachas, the SNT makes an appropriate decision.

If less than half of the total number of members of the partnership has received votes and signatures, only citizens who voted can conclude a gasification agreement.

The first way of gasification

In the first case, at the same meeting, the amounts of contributions that each owner will have to pay in order to fulfill the task assigned to the SNT are determined.

Thus, all costs for the construction of the gas pipeline are common and are divided equally among the members of the partnership.

However, there is some difficulty in this situation. Those owners who refused gasification will also be forced to pay the amount of the targeted fee.

Read also:  How to refuse gas in an apartment and a private house: legal aspects

As a result, they will be connected to the gas pipeline, like other members of the partnership, however, some individuals may evade payment of debts to SNT. If necessary, the amount of the debt is collected by the partnership forcibly through the court.

The second way of gasification

Conducting a gas pipeline to a private house increases the level of improvement of the building and the value of such real estate. If the majority of SNT members have refused gasification, the partnership may decide to conduct gas only to those houses that wish to have this communication.

For this purpose, a PNP (otherwise a consumer non-profit partnership) should be created.

PNP is a legal entity, therefore, members of the partnership interested in building a gas pipeline will have to spend money not only on paying for the work of the gas service, but also on registering a legal entity. In addition, this partnership must have an accountant and a chairman, whose activities are also subject to payment.

In the future, it is this partnership that is developing the gasification project and obtaining the consent of the gas service. All questions about the amount of membership dues required to pay for the work and the process of laying pipes are the responsibility of the PNP.

The procedure and rules for connecting gas to a private house

In order to conduct gas into the house, at the construction stage it is necessary to obtain technical specifications (TU) for tie-in to a centralized gas pipeline. The owner of the building must also have documents for the heating equipment installed in the house

It is important to arrange everything correctly so that there are no problems and overpayments in the process of further operation.

How to gasify SNT: the subtleties of connecting garden houses to the gas main

The procedure for connecting to a centralized gas supply system is regulated by the legislative acts of the Russian Federation. The main one is the "Rules for the technological connection of capital construction facilities to gas distribution networks" in the most recent edition.

In accordance with this document, for tie-in gas, the user must:

  1. Submit an application for obtaining technical conditions for gasification;
  2. Choose a technique (boiler) and determine the optimal need for a resource for your home;
  3. Obtain the approval of the competent authorities and conclude a gas supply agreement;
  4. Develop a gasification project;
  5. Fulfill technical conditions;
  6. Connect to the gas distribution network;
  7. Sign a contract for gas supply.

This is a ready-made algorithm, according to which you need to receive technical conditions and be able to freely connect to a centralized gas pipeline system that provides heating to your locality.

How to gasify SNT: the subtleties of connecting garden houses to the gas main

Application features

If we take into account the legal aspects, then the application should be submitted precisely from summer cottages:

  • First you need to collect, collect votes, drawing up the appropriate protocol.
  • After that, you will need to start preparing documentation that is transferred to the gas service.
  • Development of project documentation.
  • Approval of the project for laying a gas pipeline to a summer cottage.
  • In the case of registration of the existing borders, it will be necessary to coordinate them with the neighbors, sign the relevant acts. It may be necessary for the chairman to sign the act.

ATTENTION! Often there is not the best relationship between the owners of the site and the chairman of the community. In such cases, it is recommended to arrange public hearings.

It should be borne in mind that such a procedure has a number of features.

Regulations on the gasification of SNT

How to gasify SNT: the subtleties of connecting garden houses to the gas main

All garden and country plots in garden partnerships are provided to citizens without communications. They have no running water or gas. Gasification plays an important role in every home. This is not only a simplification of the operation of the premises, but also an increase in its market value.

In this regard, many owners of plots in garden partnerships are interested in the question of whether it is possible to conduct gas. Theoretically, this is possible, but there are difficulties with the approval of projects in gas services.

Notice! The difficulty in conducting gas to a site owned by SNT lies in the fact that it is necessary to gather all the members of the partnership and obtain their consent.

The second way to connect gas to SNT

The supply of gas to the country house creates comfortable conditions for the owners. As well as communications increase the value of the object in the real estate market. If many members of the association have refused to connect, the chairman may decide to connect to the gas only those houses that have agreed. This will avoid problems with debts for payment of communication services.

Attention! Our qualified lawyers will assist you free of charge and around the clock on any issues. Learn more here

In order to implement this, it is necessary to create a Consumer Non-Commercial Partnership. Such a step requires additional investment of funds. PNP is a legal entity.

In this regard, the members of the partnership will have to spend money not only on laying the gas pipeline, but also on registering a legal entity. The partnership should introduce the positions of accountant and chairman.

The partnership develops a gas pipeline project and obtains consent from the gas service. The jurisdiction of the PNP includes all questions on the amount of membership fees. They go to lay pipes and go to work.

What to pay attention to

To conduct gas to garden partnerships, you need to take into account the features. There are certain requirements for the Moscow region.

To connect gas to summer cottages in the Moscow Region, the following must be taken into account:

  • Timely acceptance of contributions for the use of the resource should be organized,
  • It is necessary to observe the connection terms in accordance with the technical conditions.They are valid for three years.

Gas contributions must be replenished monthly. This is necessary for the repair. Often problems arise with the collection of money. Not all members of the partnership pay dues on time.

Each owner pays the amount for the volume of consumption. Maintenance costs are divided equally among all partners of the partnership.

If the consumer does not pay to receive the resource, he may be disabled from supplying it.

Connection difficulties may arise if the partnership is considered a dead end branch. In such a situation, the gas services do not want to conclude contracts for summing up, since in the future no profit is expected from the branch.

House tax in SNT in 2019.

How to get free legal advice on SNT in Moscow, read here.

How to apply

To start the process of gasification of sites and houses administered by SNT, you need to submit an application to the resource supply service. After submitting an application, gas service employees develop technical specifications.

The application must include the following items:

  • The name of the garden partnership,
  • Location address of garden objects.

Attached to the application:

  • founding papers of the association,
  • Confirmation of the authority of the citizen who draws up the application,
  • Minutes of the general meeting of all members of the SNT, at which a decision was made to connect gas to the sites,
  • Drawings of land plots with references to objects.

Gas in snt: the optimal owner and everything connected with it

They sincerely sympathized with Zimenkova, who constantly complained about how she was ruining the car, tearing the soles and upholstering the legs, running around the authorities for them, performing the duties of the capricious Pozdnyakov.

And ... they were untwisted for money. But SNT "Luger" of the Odintsovo district, where V.

Pozdnyakov, started the process of gasification practically together with us, but was successfully gasified in a reasonable time and at an acceptable price.

Attention There Pozdnyakov was not at all like himself. He did not hide documents from anyone, he reported on the work as expected, and even without additional money he corrected what the customer did not like

Read also:  Gas check in the apartment: how and how many times gas equipment inspections should be carried out

Information on the gasification of this SNT is open to everyone on the SNT Luger website, including meeting minutes and documentation! In March of this year, according to Pozdnyakov, he handed over the fully completed documents to Lelyukh T. and Zimenkova L. But essentially nothing has changed for investors.

How to apply

To start the process of gasification of sites and houses administered by SNT, you need to submit an application to the resource supply service. After submitting an application, gas service employees develop technical specifications.

The application must include the following items:

  • Name of the garden partnership;
  • Location address of garden objects.

Attached to the application:

  • Constituent papers of the partnership;
  • Confirmation of the authority of the citizen who draws up the application;
  • Minutes of the general meeting of all members of the SNT, at which a decision was made to connect gas to the sites;
  • Drawings of land plots with references to objects.

Photocopies of papers on the property of each member of the partnership are attached to the form.

ATTENTION! View the completed sample application for gas connection in SNT:

Watch the video. About gas in SNT:

Rules for connecting gas to private households

Connection to the gasification system has always required compliance with a certain order. The main condition was the presence and installation of gas equipment in a residential building in accordance with the requirements established by regulatory enactments.

Gas will be supplied to residential buildings only if the following requirements are met:

  1. Gas boilers (no more than two) can only be placed in the basement or basement.
  2. Double-glazed windows should be installed in the room where the boilers are located, provided that they can be easily knocked out if necessary.
  3. Mandatory equipment of a residential building with pressure and temperature control devices and gas meters.
  4. Gas equipment must be purchased from a manufacturer with a special certificate, with supporting documents attached.
  5. Hoses for connecting gas equipment (no more than 1.5 m long) must be made of a material that allows gas to be supplied safely to the house.
  6. The distance from the stove to the opposite wall must be at least 1 m. A prerequisite is the equipment of the stove with the "Gas-control" system; between the hose and the faucet, a dielectric coupling against stray current must be installed.
  7. If the gas stove is placed under a canopy, then the burners must be protected from wind blowing.

There are also requirements for the kitchen room:

  1. Ceiling height not less than 2.2 m.
  2. Volume: at least 8 m³ for a two-burner stove, at least 12 m³ for a three-burner stove and at least 15 m³ for a 4-burner stove.
  3. Be sure to have in the kitchen: a window, a gap under the door and an exhaust ventilation duct.

If the above requirements and conditions are not met, the connection of a private house to the gas supply system will be refused. The owner of the house is responsible for fulfilling the requirements.

If the gas pipeline is located further than 200 m from the household, the cost of gasification will be quite high

The coordination of the passage of the gas pipeline through the lands of other owners, the preparation of technical specifications and the resolution of other "gas" issues have become completely the prerogative of the gas distribution organization (abbreviated as GDO).

It is OblGaz or RayGaz that are obliged to bring the gas pipeline to the boundaries of the applicant's site according to the completed application.

Technical conditions for connecting gas to a private house, as well as the price of gasification are part of the agreement with the GDO. Previously, before Decree No. 1314, specifications were a separate document that served as a justification for the design and construction of a gas pipeline. Now the technical conditions are just an appendix to the gasification agreement, i.e. not a standalone document.

Note that the technical conditions provided at the request of the homeowner within two weeks are preliminary. By providing them, the gas distribution organization only informs about the admissibility of gasification and it is impossible to use these data for the construction of the gas pipeline. However, preliminary specifications are required only for industrial consumers with a methane consumption of more than 300 m³/h.

What does gas in the house mean?

How to gasify SNT: the subtleties of connecting garden houses to the gas main

This is the most optimal and least expensive option. That is, when the gas main is brought directly to the site. And if the object of sale is a finished house, pipes have already been laid in it and the presence of:

  • allocated space for the boiler room;
  • tuned boiler and auxiliary equipment;
  • pressure reduction cabinet;
  • smoke sensor and alarm;
  • batteries and various regulators.

This is a turnkey solution that allows you to use gas immediately, provided that there is no debt behind the house. Otherwise, the problems of the previous homeowners may turn into bureaucratic litigation for the new owner. Therefore, it is better to immediately clarify all these points at the stage of buying a house and a land plot.

How to gasify SNT: the subtleties of connecting garden houses to the gas main

How to make a gas supply plan at home (gasification project)

The gas supply project for a private house is a necessary component to start all work. Gas consuming installations are potential sources of danger and safety regulations must be observed.

To draw up a correct gas supply plan for a house, specialists need to thoroughly know all the points of regulatory documents and strictly follow them. The technical department of the gas economy always checks the compliance of the plan with the requirements of regulatory documents and, if necessary, returns them for revision.

The requirements that gas utilities impose on projects may differ depending on the landscape of the area, the method of laying, and installation conditions. In order to thoroughly test the plan, it can take several weeks, or even months.

Projects must be strictly individual, plans that were developed for other houses are prohibited by law, criminal liability is provided for this.

How to gasify SNT: the subtleties of connecting garden houses to the gas main
The project must indicate the layout of the house and the location of gas equipment

The stages of connecting gas to a private house in each case will differ, since they depend on the relief of the site and the individual features of the gasification plan.

Can I join later

The large amount of gasification costs scares away many owners of plots in a partnership. But over time, the advantages of a house with gas convince you of the need to also connect to the pipeline. Is it possible to connect after all work is completed?

Members of the partnership should anticipate such options. After all, if the current owner of the plot does not need gas, then, for example, the one who will buy the land in the future may be interested in it.

SNT can supplement the list of participants in the agreement, if there are those who wish. Citizens who join will reimburse their share of connection costs.

How to deal with refusers

None of the owners of summer cottages can be forced to connect gas. At the legislative level, a way out of this situation is provided. Often the reason for the refusal is the lack of funds from citizens, which are necessary to pay for the work of conducting and connecting.

Responsibility and the right to dispose of the gas pipe on the site are received by those owners who signed the agreement. In the course of use, new members may be added to the agreement.

Owners are responsible for fundraising, usage and maintenance fees. Arrears in payment for services leads to disconnection from the supply. Restoring supplies is a difficult process.