- We conduct gas: how long does it take and how much does it cost?
- The second way to connect gas to SNT
- SCHEME OF WORK FOR THE DESIGN OF GAS CONNECTION
- REQUIREMENTS FOR GASIZED PREMISES
- If your locality is not included in the program
- Country lawlessness: how to deal with the seizure of your territory?
- Autonomous gasification: cheap, fast and hassle-free
- Rules for connecting gas to a private house 2019
- COST OF THE SERVICE FOR THE CREATION OF A GAS CONNECTION PROJECT
- ADVANTAGES OF WORKING WITH ENERGOGAZ Group of Companies
- Categories of gasified objects
- What does "gas border" mean?
- Gas connection price in Russian regions
- A little about prices and ways to save
- The cost of putting the gas pipeline into operation
- The nuances of gasification of the cottage
- Technical conditions for gasification of a country house
- 2 Connection price and benefits
We conduct gas: how long does it take and how much does it cost?
The answer to this question depends on many factors. Among them: the remoteness of your private house from the main gas. Diameter of the section of the gas pipe. It is also necessary to assess whether the owners of neighboring sites will allow the gas to pass through their territory. It will be necessary to obtain their written consent to carry out the gas. Is there enough pressure in the line? What is the area of your private house - the amount of gas consumed depends on it.
Often, problems arise for land owners who want to conduct gas to a house located in SNT. The boards of the SNT can put obstacles, tk. they are interested in making it possible to conduct gas only centrally. In such cases, the price of conducting gas can be much higher for a SNT member.
When conducting gas to a site intended for individual housing construction (IZHS), the situation may be complicated by the need to carry out work to coordinate the laying of a gas pipeline with local governments. They own, for example, the roads through which the pipe passes. We are carrying out work on coordinating the laying of gas and have already gained extensive experience in interacting with local structures.
Since we have been supplying gas for many years, the following practice has developed: the owners almost always lack some documents. We help to obtain the missing documents, after which it is already a technical task to install gas. The cost varies each time, but the average is 200,000 rubles for paperwork plus 100,000 rubles for carrying out work. The term for conducting gas varies
If you want to carry out gas quickly, it is important to establish close cooperation with gas services. If there are no special acquaintances, the process can drag on for several years.
Entrust the work to professionals - we have worked in all districts of the Moscow region. We have been running gas for several years and we have the experience and contacts necessary for the fastest possible gasification of your home.
Remember that unauthorized or improperly conducted (insertion) into a gas pipeline is a criminal offense. Decree of the Government of the Russian Federation of July 21, 2008 No.N 549 "On the procedure for the supply of gas to meet the domestic needs of citizens", adopted in accordance with the Federal Law "On gas supply in the Russian Federation", approved the Rules for the supply of gas to meet the domestic needs of citizens. These rules govern the relations arising from the supply of gas to meet the domestic needs of citizens in accordance with the gas supply agreement (hereinafter referred to as the agreement), including establishing the features of the conclusion, execution, amendment and termination of the agreement, its essential conditions, as well as the procedure determination of the volume of consumed gas and the amount of payment for it.
In our practice, there are cases when citizens who decided to arbitrarily conduct gas to a private house were held criminally liable under paragraph “b” of Part 3 of Art. 158 of the Criminal Code of the Russian Federation. And here the question “how much does it cost” takes on a completely different meaning ...
The second way to connect gas to SNT
The supply of gas to the country house creates comfortable conditions for the owners. As well as communications increase the value of the object in the real estate market. If many members of the association have refused to connect, the chairman may decide to connect to the gas only those houses that have agreed. This will avoid problems with payment arrears communication services.
Attention!
In order to implement this, it is necessary to create a Consumer Non-Commercial Partnership. Such a step requires additional investment of funds. PNP is a legal entity. In this regard, the members of the partnership will have to spend money not only on laying the gas pipeline, but also on registering a legal entity. The partnership should introduce the positions of accountant and chairman.This requires additional payroll costs.
The partnership develops a gas pipeline project and obtains consent from the gas service. The jurisdiction of the PNP includes all questions on the amount of membership fees. They go to lay pipes and go to work.
SCHEME OF WORK FOR THE DESIGN OF GAS CONNECTION
1. Residential building gasification project (for individuals):
- selection of a place for laying an underground gas pipeline;
- selection of places for distributing internal gas pipelines;
- equipment selection;
- selection of equipment locations;
- implementation of a preliminary design, coordination with the Customer;
- drawing up a working draft;
- approval of the working draft.
For a gasification project for a residential building, it is necessary to provide a plan of the gasified house, technical specifications and engineering and geodetic surveys (if you did not order a comprehensive service).
2. Project of gasification of a settlement, an industrial facility:
- analysis of a possible place for laying a gas pipeline route, including preliminary coordination with executive authorities, local governments, operating services, determination of private land ownership;
- performance of engineering-geodetic and engineering-geological surveys, if necessary, passing the state examination, in accordance with the legislation on urban planning, additional engineering and environmental surveys are carried out;
- execution of design work;
- coordination of the project with executive authorities, local governments, operating services;
- passing the state examination, in accordance with the legislation on urban planning;
- obtaining permission to place an object in the Moscow region or an urban planning plan for a land plot in Moscow.
REQUIREMENTS FOR GASIZED PREMISES
Today it is difficult to say what specific requirements apply to the premises in which the installation of gas-consuming equipment is planned. There are at least four regulatory documents.
One of the regulatory documents (SNiP 41-01-2003 "Heating, ventilation and air conditioning") states that in the case of installing a gas boiler with a closed combustion chamber, a room volume of at least 7.5 m3 is required and does not regulate the need to install a ventilation duct in the room ( natural ventilation), while another regulatory document (SNiP 42-01-2002 "Gas supply") requires a room of at least 15 m3 and 6 m2, and according to fire safety rules (SNiP 21-01-97 * "Fire safety of buildings and structures ”), in all rooms where gas-using equipment is installed, a ventilation duct must be provided to ensure three air exchanges per hour.
Also, each manufacturer indicates its requirements for the installation of gas equipment, most often they are associated with the conditions for its further operation.
This is not a complete list of all requirements. It is impossible to develop one unified scheme for the gasification of any facility.
Therefore, the first step of ENERGOGAZ Group of Companies in gasification is a survey of the gasified object. There are no houses that cannot be gasified!
If your locality is not included in the program
In this case, the leader of the initiative group must also act.He sends a request for a list of necessary documents to the municipal authorities and oblgaz. It is also necessary to get an answer whether gasification of the settlement is possible in principle (are there organizations with the authority to do this).
Further, the residents determine the owner of the central gas pipeline. This may be a municipality, oblgaz, Gazprom, or any legal entity.
Country lawlessness: how to deal with the seizure of your territory?
Next, you need to prepare technical documentation
And it is important to contact the design company to develop a project for supplying gas to the settlement
Then a contract is concluded with a contractor that carries out the work.
After that, all residents buy gas appliances, the oblgaz checks them and then supplies gas to the houses.
Autonomous gasification: cheap, fast and hassle-free
An alternative to this lengthy and expensive process can be autonomous gasification - the placement of an underground gas tank (gas tank) on the site. Liquefied propane-butane for storage in a gas tank is delivered by special filling trucks.
Autonomous gasification will cost several times cheaper and will take not months and years, but only one day. With the amount saved, the house can be heated for several years. Although natural gas is slightly cheaper than propane-butane, the difference is negligible and is shrinking every year.
With autonomous gasification of your home, neither permits, nor approvals, nor the provision of documentation are required. To select equipment, it is enough for specialists to know the area of heated premises and other reasons for energy consumption (for example, heating water in a pool or powering a gas power generator).


The underground gas tank is safe and does not take up space on the site. Garden crops and perennial shrubs can be planted above the container. Only a hatch with a diameter of 60 cm remains visible, slightly protruding above the ground (pictured).
Do not wait to connect to the main gas pipeline. Gasify today!
Call and get expert advice
+7 (495) 220-74-46
Click on the number to call.
Rules for connecting gas to a private house 2019
The legislative framework clearly defines the rules for connecting gas to a private house in 2019. Their observance will help to avoid emergency situations, damage to property and human casualties.
The list of such rules:
- All subscribers are divided into three groups (with gas consumption up to 15 cubic meters in 3 hours, up to 500 cubic meters and over 500 cubic meters in 3 hours).
- The unit of account for determining the cost of connection is the distance from the house to the source gas pipeline. Experts start from whether the dwelling is 200 meters from the gas distributor or up to this mark.
- Gas service workers bring a pipe from the gas distributor to the site boundary. After that, the owner of the house can decide for himself how to conduct gas through his territory.
- Gas workers perform such work on gas supply to a private house: the construction of a gas pipeline to the border of the site, its tie-in, checking and receiving the gas pipeline on the territory of the site, which the owner built himself, starting gas.
- If the house is not subject to gasification and there is no way to connect it to a gas source, then the owner is not issued documents authorizing the connection.
- Applications can now be submitted to customer service. This is a “window” in which applications are made, contracts are concluded, technical conditions are received.This principle is much more convenient, because you do not need to visit many instances. All of them are collected in one place.

COST OF THE SERVICE FOR THE CREATION OF A GAS CONNECTION PROJECT
Those who want to get a project for gas, first of all, ask themselves the question - how much does it cost to create a project? The price of developing a gas connection project consists of a set of works:
- departure and consultation of the customer at the facility;
- engineering and geodetic surveys (special conditions for New Moscow);
- implementation of the gasification project;
- project approval;
- performance of construction and installation works;
- comprehensive system testing;
- preparation of a set of executive and technical documentation and delivery of the commission.
When concluding an agreement with our company, you can be sure that the cost of the service will not increase during the work, the guarantee of this is indicated in the corresponding clause of the agreement.
The high level of interaction between all the structures of the ENERGOGAZ group of companies allows us to optimize the price of works. Many are frightened by the opinion that the gasification process may be delayed, accompanied by large financial losses that cannot be predicted at the initial stage of work. This state of affairs is possible if all the necessary work on the exploration, design, construction, supply of equipment is carried out by various organizations. After all, there will be no one to present the violations identified by the acceptance committee, since each contracting organization has completed its scope of work. Interacting with the group of companies "ENERGOGAZ", at the initial stage you will have a complete picture of the cost and timing of the service. Also, we have direct contracts with manufacturers of process equipment and gas pipes, which allows us to provide low prices.
THE TOTAL COST OF CREATING A GAS CONNECTION PROJECT IS CALCULATED ACCORDING TO THE ESTIMATE
An example from real practice.
An example of gasification of a house of 150 m2.
The average cost of gasification is 210,000 rubles. (favorably distinguishes from other companies by the fact that this cost includes absolutely all of the work listed above).
Additional payment is made for work on "technological connection" (in the region of 50,000 rubles, in accordance with the RF PP 1314 of December 30, 2013) to the territorial trust GUP MO MOSOBLGAZ. You also need to consider that a gas boiler and a gas stove are paid separately. In some cases, it is necessary to replace the ground loops and examine the smoke and ventilation ducts (the cost of each service in ENERGOGAZ Group does not exceed 6,000 rubles). The cost of boiler installation and commissioning depends on the type of boiler. For example, a set of works on installation and commissioning of a wall-mounted boiler Buderus U072-24K (Germany) is 12,000 rubles. The boiler heats up to 200 m2 of area and heats water for the hot water supply system.
ADVANTAGES OF WORKING WITH ENERGOGAZ Group of Companies
ENERGOGAZ Group of Companies is ready to offer gas connection design services both to large companies, the structure of which requires an individual approach to solving problems, and to an individual who needs help in gasifying their home. The interaction of all structures of our company allows us to optimize the work as much as possible, offering a very flexible pricing policy. The company guarantees compliance with the deadlines and bears full responsibility for the result. In case of non-fulfillment of obligations - a refund.
Direct deliveries of equipment from manufacturers will ensure its high-quality and long-term operation.And most importantly, already at the initial stage of cooperation, you will know exactly the amount of financial costs, the value of which will not change in the course of work.
Categories of gasified objects
According to Decree No. 1314 of the Government of Russia, homeowners need to find out how much it costs now to bring gas into their homes by contacting the regional gas distribution service.
First of all, household expenses for technological connection depend on the volume of gasification works. In this regard, three categories of capital objects have been identified.
The first category of objects. The first category includes private households whose total consumption of natural gas does not exceed 5 m³/h.
Small businesses are equated to them, the technological equipment of which consumes no more than 15 m³ / h of a mixture of propane and butane. Those. the lowest fee for connection to the gas distribution network is charged for cottages with an area of less than 300 m² and small businesses from the public utility area.
The installation work on the supply of the gas pipeline will be completed at the border of the site. The layout of the gas pipe for the consuming equipment of the household on its territory is carried out according to a separate project
The possible scope of work on laying connecting gas communications to the household of the first category is limited:
- the greatest distance from the main gas distributor to the equipment consuming gas is less than 200 m;
- gas pressure in the gas supply source - up to 0.3 MPa.
In addition, the laying of introductory gas pipelines is carried out without the construction of reduction points (pressure reduction) of the main natural gas.
The fee for connecting the gas pipeline for objects of the first category is 20,000-50,000 rubles (clause 8 of the appendix to the order of the Federal Tariff Service of the Russian Federation No. 101-e / 3 of 04/28/2014). The exact price is determined by the local GDO according to the conditions in the given territory, but cannot exceed 50,000 rubles.
The second category of objects. Among the objects of the second category are households, the connection of which requires distribution gas pipelines and / or the creation of points for reducing the main gas. Their estimated gas consumption is higher than the norm for objects of the first category, a higher gas supply pressure is required (i.e. 0.6 MPa or more), etc.
Compliance with the cost of connection in the first category is observed if the pipeline is inserted into a low-pressure gas pipeline. If gas reduction is required, the connection price will exceed 50 thousand rubles.
In the private housing sector, objects falling under the second category usually have an area of more than 300 m². For their gasification, standardized tariff rates are applied, calculated according to the methodology developed by the Federal Tariff Service of the Russian Federation (Appendix to Order No. 101-e / 3 of April 28, 2014).
It should be noted that applicants for consumption volumes of natural or artificial gas from 300 m³/h and above are required to coordinate gas connections with the GDS, which has a technological connection with the contractor's gas pipeline.
Approval of the amounts of tariffs for connecting gas to households of the second category is made by the local executive authority of the REC (ie the regional energy commission).
The third category of objects. The capital construction objects of the third category include farms that need an individual gasification project.For them, the amount is determined according to the design and estimate documentation, which has previously passed the examination.
The amount of expenses for gasification for households of the third category is established by the REC, related to the location of the economy connected to the main gas.
The prices for laying the gas pipeline along the section from the border entrance are not the same for different companies. However, it is worth considering the need for numerous gas project approvals. Full-fledged gasification will happen faster with an experienced contractor
The following conditions are considered to be characteristic features of the applicants' facilities in need of gasification:
- planned consumption of natural gas from 500 m³/h;
- work on connection to the gas pipeline requires the pipeline to be laid out through the forest fund, along rocky soils, swamps and water obstacles;
- gas pipeline installation work requires passing through obstacles that force the use of horizontal directional drilling.
Those. According to Government Decree No. 1314, there are actually no rigid prices for the technological connection of applicants to the gas network. The cost of gasification works depends on a number of conditions that determine its size in the framework of the relevant methods of the Federal Tariff Service of the Russian Federation.
What does "gas border" mean?
Before buying a house without gas communications, you should carefully evaluate all the nuances associated with wiring blue fuel into the building. As mentioned above, the price of connecting gas to a house can be high. When you find out the whole truth about the real state of affairs, then the euphoria from buying a home passes.
And not only for this reason, you will not immediately move into your own house, you will still need to go through many offices and solve bureaucratic problems for connecting blue fuel
And the family will again need to save money in order to raise money for home improvement. This will delay the move. The phrase, which is often found in advertisements for the sale of real estate: gas passes along the boundary of the site, means that gas pipes pass nearby, but gas supply has not been carried out to the house.
The homeowner will have to independently draw up documentation for conducting gas to his home, hire specialists to do all the work related to gas supply to a private house. In addition, all material costs for the purchase of gas pipes, valves, paint, a meter, a boiler, a gas column, etc. will fall on the shoulders of the owner of the dwelling.
Still, you will need to negotiate with the neighbors, and pay them their part of the investment for the fact that they stretched gas pipes to the boundaries of the site, and paid for the construction of a gas distribution station (gas distribution station), if such is provided for by the project.
Gas connection price in Russian regions
The cost of gasification of the site is largely related to its location. The largest amount for connecting to the gas network will have to be paid to homeowners of the Moscow region - 400,000-700,000 rubles. (the most expensive within the boundaries of Moscow).
For owners of country cottages in the Leningrad region, gas installation will cost less than in the capital region - in the region of 300,000 rubles.

If the applicant wishes to lay a gas pipeline under rivers, highways, etc. - it is possible. But the use of horizontal directional drilling will increase the cost of gasification of households
Gasification is the cheapest in the European regions of the Russian Federation, where a gas pipeline can be put into operation for 70,000-120,000 rubles. And in the Nizhny Novgorod region, the connection of a home gas network with a natural gas main costs approximately 150,000-200,000 rubles.
In the regions in the east of Russia, the gas pipeline network is poorly developed, since there are much fewer industrial centers there than in the western regions. For example, in the Novosibirsk region, the expenses of private homeowners for gasification will be at least 200,000 rubles.
The most difficult situation with gas pipelines is in the regions of the Far East, where there are very few gas pipelines. Local owners of plots, even if they belong to the first category of applicants, will spend an average of 200,000-250,000 rubles. for the gas supply of your cottage.
A little about prices and ways to save
According to the new rules for connecting to gas pipelines, prescribed in Decree No. 1314, the cost of connection depends on the category of consumers.
For private houses and cottages, there are three options:
- When the gas consumption is no more than 5 cubic meters per hour, the connection will cost 20 thousand rubles. At the same time, the distance in a straight line from the gas boiler to the gas distribution network should not exceed 200 m.
- For buildings where the estimated consumption is planned at the level of 5-15 m3 / h, the supply to the border of the site will cost within 50 thousand.
- If the volume of consumption exceeds 15 m3/h, an individual calculation is carried out.
This cost includes the development of technical conditions by the gas distribution organization and the supply of a pipe from the main gas pipeline to the owner's territory. For a fee, you can also agree on installation work on the site. Usually, the cost of such services is cheaper than that of private organizations, but the execution time is much longer, and if the workload is high, it can even stretch for an indefinite period.
Drawing up a project is a separate item of expenditure, which will cost from 10 to 100 thousand rubles (much depends on the region and the size of the building). If you give preference to a company that not only designs, but also has a license for installation work, you can save up to 20-35%.
Ask your neighbors, maybe they will want to join the highway, then the cost of materials and many works can be divided
Collective connection is another option for those who are looking for a way to connect their cottage to gas with the least loss of funds. In addition, many localities have regional connectivity programs and subsidies.
The cost of putting the gas pipeline into operation
The actual construction of gas communications on the site does not mean the end of costs. The gas pipeline still needs to be put into operation, otherwise it cannot be used.
For the delivery of the gas pipeline at the site, the following is required:
- control and executive survey (preparation, registration) - 15,000-35,000 rubles. The shorter the gas pipeline, the cheaper the CIS;
- inspection of ventilation ducts and chimneys in the form of an act - approximately 5,000 rubles;
- grounding the boiler (protocol and circuit sketch) - about 5,000 rubles;
- examination of insulating joints in the form of an act - 7,000 rubles. for each;
- verification of executive and technical documentation - 4,000 rubles;
- calling Mosoblgaz inspectors - approximately 3,000 rubles;
- preparation of a gas inlet service agreement - up to 2,000 rubles;
- re-approval of the project will cost a maximum of 4,000 rubles.
At the end of the work on the operational commissioning of the gas pipeline, it is necessary to issue executive and technical documentation at the RES of the local gas service, sign it at the gas management trust and submit it to the archive.
Next, make an entry for the gas tie-in and the initial start-up. For the Moscow region, the costs of ITD and the launch of the gas pipeline will amount to about 35,000-5,000 rubles.
The nuances of gasification of the cottage
Under the terms of Decree of the Government of the Russian Federation No. 1314 dated December 30, 2013, in force since March 2014, the homeowner is not obliged to independently resolve the issues of connecting his estate to the gas pipeline.
The coordination of the passage of the gas pipeline through the lands of other owners, the preparation of technical specifications and the resolution of other "gas" issues have become completely the prerogative of the gas distribution organization (abbreviated as GDO).
It is OblGaz or RayGaz that are obliged to bring the gas pipeline to the boundaries of the applicant's site according to the completed application.

If the gas pipeline is located further than 200 m from the household, the cost of gasification will be quite high
Previously, before Decree No. 1314, specifications were a separate document that served as a justification for the design and construction of a gas pipeline. Now the technical conditions are just an appendix to the gasification agreement, i.e. not a standalone document.
Note that the technical conditions provided at the request of the homeowner within two weeks are preliminary.
Technical conditions for gasification of a country house
The technical conditions clearly spell out the rules for connecting to a centralized gas supply. This is an integral document when carrying out this type of work, including various schemes, graphs and drawings.
The authorities to issue technical conditions are the enterprises that are gas suppliers in the region. You can connect the main gas pipeline exclusively to the house. It can be either a private cottage or a summer house, in which they live only in the warm season.
When applying for technical specifications, you will need a number of documents:
- identity documents of the applicant;
- certificate of ownership of the house;
- title documents for the land;
- technical passport for the house;
- situational plan.

If necessary, you may also be asked for additional documents. Employees of the gas supply organization must consider your application within 10 working days and make a decision. Any refusal issued by the gas supplier must be documented and motivated by specific reasons.
2 Connection price and benefits
From 01.03.2014 new rules for connecting residential buildings to the gas distribution system are in force. They contain the old norms and changes have been made that relate to the timing of work and cost. Thanks to this, the connection has become more profitable, takes less time.
Prices vary, depending mainly on the remoteness of the object, but on average you will have to pay:
- for filling out an application, obtaining a permit and primary documents - from 8 to 50 thousand rubles;
- the production of the project will cost 3-20 thousand;
- laying a pipe from the main to the facility - 2-5 thousand per meter;
- tie-in to the gas pipeline - from 10,000 to 15,000 rubles;
- a readiness check by technical supervision costs an average of 2,000.
In the regions there is a significant fluctuation in prices. For example, in the Moscow region it is 400-500 thousand for all work. The cost is determined by the distance from the capital. In the Leningrad region, 300 thousand rubles are enough, and in the Nizhny Novgorod region - 150-200 thousand. The cheapest gas pipe in a private house will cost in the European part of Russia, an average of 100 thousand rubles. Beyond the Urals, the situation is somewhat different; many settlements are located at a considerable distance from industrial centers and gas pipelines.
The region of the Far East, where there are very few highways, is problematic in this respect. Even if the main pipe is nearby, for a tie-in to a gas pipeline for an amount less than 200 thousand, one cannot count. Equipment is imported from nearby foreign countries, which affects prices. The diversity of the climate also prevents the application of standards that are used in other regions.
There are many benefits in Russia, but at the state level they do not apply to gasification. The federal government transferred this right to the local. In the regions, first of all, veterans of the Second World War, the disabled, combatants, single mothers (fathers) receive financial assistance for connection. The Leningrad region can be cited as an example: here 70,000 rubles are allocated from the budget for ordinary citizens, and 110,000 rubles for beneficiaries.
The presidential program plays an important role in rural areas. It provides:
- construction and reconstruction of gas distribution networks;
- the use of energy-saving technologies for installation;
- increasing the efficiency of the use of natural resources.
Companies are guided by federal law, the percentage of residents covered by gasification is increasing. The new rules provide for the possibility for rural residents to submit a collective application for the installation of pipes from the main to the plots. If it is satisfied, the supply to the settlement is free of charge. Property owners connect to the network at their own expense.