Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

Laying a gas pipeline to a private house: methods, equipment, requirements

What does "gas border" mean?

Before buying a house without gas communications, you should carefully evaluate all the nuances associated with wiring blue fuel into the building. As mentioned above, the price of connecting gas to a house can be high. When you find out the whole truth about the real state of affairs, then the euphoria from buying a home passes.

And not only for this reason, you will not immediately move into your own house, you will still need to go through many offices and solve bureaucratic problems for connecting blue fuel

And the family will again need to save money in order to raise money for home improvement. This will delay the move. The phrase, which is often found in advertisements for the sale of real estate: gas passes along the boundary of the site, means that gas pipes pass nearby, but gas supply has not been carried out to the house.

The homeowner will have to independently draw up documentation for conducting gas to his home, hire specialists to do all the work related to gas supply to a private house. In addition, all material costs for the purchase of gas pipes, valves, paint, a meter, a boiler, a gas column, etc. will fall on the shoulders of the owner of the dwelling.

Still, you will need to negotiate with the neighbors, and pay them their part of the investment for the fact that they stretched gas pipes to the boundaries of the site, and paid for the construction of a gas distribution station (gas distribution station), if such is provided for by the project.

Gasification of a private or country house - where to start

The first thing with which the gas supply of a private house begins is the technical documentation. You need to contact the relevant authority that deals with such issues in the area. A special commission will determine the condition of the tenant and the possibility of carrying out installation work. After that, the specialists will develop a project, it will be approved by the licensing authority, and employees of the gas industry or a company that has a permit for such work will begin the connection process. The cost of connecting gas to a private house before the development of the project can only give you an approximate estimate, since the final price of materials and services consists of many components.

If a gas main is already running near the house, then you will only have to pay for the tie-in into the pipe - otherwise, the cost of the project most often includes work on laying the line along the street

Pipe connection process

Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

Either the SNT or the PNP created by the members of the partnership is responsible for submitting an application to the gas service for conducting gas to private homes.

To connect objects to the gas pipeline, you need to know the technical conditions for connection and obtain permission to carry out these works (not every house can participate in gasification). You can find out this information at the city gas distribution institution or gas service.

The next step is to develop a gasification project. Design work can only be carried out by enterprises that have the appropriate license.

The project of the gas supply system prepared by specialists is subject to agreement and approval in the gas service.

The SNT or PNP is responsible for choosing the organization that will carry the gas to the sites. It is mandatory to conclude a contract with the contractor for the provision of services. However, after the pipes are laid, the work does not end.

In order for gas to be supplied to the house, it is necessary to sign an appropriate contract for the maintenance of the gas pipeline and the supply of the resource. In addition, the quality of the connection is subject to verification. In the future, the consumer pays for the amount of gas that was used by him.

Read also:  How to choose a hood over a gas stove: what criteria to consider when choosing a suitable model

How to calculate the need for gas?

An employee of the supplier can determine the private need for gas free of charge, provided that the need of the customer (consumer of services) does not exceed the consumption rate of 5 m3 per hour. This figure is calculated for houses up to 100 square meters. m. If the consumer does not go beyond this consumption rate, then he may not need to calculate in the package of documents for the issuance of technical specifications.

For all other cases, you will need to calculate the consumption.To obtain it, it is necessary to measure the total area of ​​​​heated premises. Then determine the maximum consumption of hot water for heating. Based on the consumption, a boiler of a certain capacity is selected. For example, for a house with an area of ​​​​100 meters, you will need a 10 kW boiler.

To calculate the need for gas at home, you should invite a qualified craftsman from a specialized organization that has heat engineers on its staff. The master will issue an official conclusion, which is attached to the general package of documents. Contact proven companies that can do all the work inexpensively and in a short time.

Rules for gasification of a private house

First of all, before starting the installation of a gas pipeline in a private area, it is necessary to inform the local gas service. As a rule, together with the gas service, the order of future work is determined. In addition, it is necessary to obtain permission to carry out future work from another inspection - the automobile one. Next, you need to draw up a plan for gasification of the site. To do this, it is recommended to contact specialists, since self-planning can lead to an emergency.

If there are already houses connected to the gas pipeline in your area, then the work is simplified. In such a situation, all that needs to be done is to connect to the main highway passing nearby. However, before connecting, it is definitely recommended to contact the gas service, which must necessarily provide you with the working pressure parameters in the main line. These data are necessary to select the material of the pipes from which the future structure will be mounted.

All systems transporting gas to consumers are divided into two main types:

  • autonomous;
  • central.

Consider step by step the steps that need to be performed directly when laying gas pipeline communications in a private house:

  1. Lay the gas pipe from the distributor to the house. If necessary, a pipe is inserted into the main line.
  2. At the point of entry of the gas pipe into the house, it is necessary to install a special cabinet. Such a cabinet must necessarily be equipped with a device that lowers the pressure (reducer).
  3. At the next stage, intra-house wiring is performed. To organize a gas pipeline inside the house, it is recommended to use pipes that can withstand low pressure.
  4. Next, the mounted system is checked for operability. All necessary commissioning works are being carried out.

The second way to connect gas to SNT

The supply of gas to the country house creates comfortable conditions for the owners. As well as communications increase the value of the object in the real estate market. If many members of the association have refused to connect, the chairman may decide to connect to the gas only those houses that have agreed. This will avoid problems with debts for payment of communication services.

Attention!

In order to implement this, it is necessary to create a Consumer Non-Commercial Partnership. Such a step requires additional investment of funds. PNP is a legal entity. In this regard, the members of the partnership will have to spend money not only on laying the gas pipeline, but also on registering a legal entity. The partnership should introduce the positions of accountant and chairman. This requires additional payroll costs.

The partnership develops a gas pipeline project and obtains consent from the gas service. The jurisdiction of the PNP includes all questions on the amount of membership fees. They go to lay pipes and go to work.

Read also:  Electrolux geyser troubleshooting: diagnostics of popular breakdowns and troubleshooting methods

What does gas at the border of the site mean?

The wording "gas at the border of the site" is often found in documents for a land plot for individual construction. As a rule, these are plots on the territory of a dacha cooperative or a cottage village. The term mentioned above means that a gas main has been laid on the area of ​​the territorial association and there is an opportunity to connect to it.

Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

Many inexperienced buyers buy such plots, hoping that in the future, after building a house, they will be able to gasify it without any problems. However, this is not the case, and here's why:

Usually, the administration of the village or the management company takes care of the expenses for the gas pipeline. Thus, the local cooperative itself determines the cost of tie-in to this gas pipeline. If you are buying a plot in populated villages, at a stage when everyone has built houses for a long time, you should be prepared for the fact that the total power consumption may be too high, and you may be denied connection to the main.

Thus, we have come to an important difference between the concepts of "gas in the house" and "gas along the border of the site":

If you joined the cooperative at the stage of gasification of the village, you still have to wait for some time. In some cases, the waiting period lasts 1.5-2 years.You need to be prepared for this, especially if you are going to move into a built house for permanent residence.

Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

As a rule, plots with communications along the border are much cheaper, which attracts potential buyers. At the same time, no one stipulates the nuance that further connection to the highway can be very expensive, and organizations that carried the gas pipeline to the territory of the village can speculate on prices.

There are cases in the Moscow region when the price for gas connection alone reached 1 million rubles

Therefore, before formalizing the transaction, it is important to clarify all aspects of the site related to communications. Please note that in addition to connecting the gas pipeline, you may incur other additional costs if power distribution panels and water distributors are located far from the site

What does gas in the house mean?

Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

This is the most optimal and least expensive option. That is, when the gas main is brought directly to the site. And if the object of sale is a finished house, pipes have already been laid in it and the presence of:

  • allocated space for the boiler room;
  • tuned boiler and auxiliary equipment;
  • pressure reduction cabinet;
  • smoke sensor and alarm;
  • batteries and various regulators.

This is a turnkey solution that allows you to use gas immediately, provided that there is no debt behind the house. Otherwise, the problems of the previous homeowners may turn into bureaucratic litigation for the new owner. Therefore, it is better to immediately clarify all these points at the stage of buying a house and a land plot.

Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

Gasification project

Project documentation is compiled on the basis of information about specifications.The list of documents includes the following information:

  • the place of entry of the gas pipe into a private house;
  • wiring communications throughout the facility and inside the house;
  • a list of necessary work when connecting;
  • security measures;
  • work estimates;
  • recommendations on the technical characteristics of gas equipment.

Gas at the border of the site - what does it mean? Features of connecting to an existing gas pipeline

Project of gasification of a private house

To develop design documents, the designer on site takes the necessary measurements, while taking into account the wishes of the customer regarding the location of gas appliances. The gasification project can be drawn up by specialists of the gas distribution company, but the law provides for the possibility of attracting third-party companies to develop the project, but their services will cost more. However, in this case, the documentation will be compiled faster. When contacting a third-party design organization, it is necessary to check whether it has a license to carry out these works.

Read also:  Transferring a gas stove within the kitchen and to another room: transfer rules and the procedure for its approval

Previously, a project for the distribution of gas throughout the house was needed only for buildings of 3 floors and above with 1 family living. However, according to SP 402.1325800.2018, from 06/06/2019, the gas supply project will become mandatory in other cases when connecting to gas.

Gasification of SNT

Having decided on such actions, one should not hope for the establishment of calm, since the situation may involve the emergence of both positive and negative moments.

First option

To complete the gasification of SNT, a general meeting must be held. If the majority (with a signature) votes for the decision, then gasification is carried out. The size of the target contribution of participants for the task is also set.It is calculated by dividing the total costs among all members of the partnership.

Some growers will (legitimately!) acquire debt, but in fact will not be able to pay it off. Naturally, there is the possibility of deferring debt obligations. The solution may also be the conclusion of loan agreements between those who wish to conduct gas faster and those who prefer to wait.

Of course, other solutions for calculating debts on contributions are also possible. Groups of people will arise who oppose the gas and stubbornly adhere to this position. One way or another, they will obey, because the justification for the supporters of the idea will be the fact that the prices for such sites will increase several times.

The main thing is to observe legal transparency in resolving the issue. This road, from the standpoint of formalization, is quite simple, if the partnership does not take into account the burden of litigation to collect debts from its own members who do not want to pay, however, if you rely on human relations and the activities of the partnership, it is rather doubtful.

What to do if the gas is turned off in the apartment?

How to connect gas to a private house read here.

Second option

Carrying out gasification of exclusively plots owned by members of the partnership who supported the idea. For such a purpose, in order to obtain technical conditions for gasification, it is necessary to organize the creation of a consumer non-profit partnership.

The process of creating a partnership involves the incurring of costs for the registration of a legal entity, the organization of an administrative resource (including the position of an accountant, chairman), and payment for the activities of the latter.

Further actions are to obtain by the partnership the technical conditions regarding the connection, the solution of design issues, the moment of coordination and the direct construction of the gas pipeline itself. In this case, the owners of the gas pipeline branch will be the participants of such an OP.

It is they who are responsible for the maintenance of this property, the conclusion with the help of NP contracts for the maintenance of a branch. They are entrusted with the solution of issues of including new participants in the partnership and claiming membership fees. Such a decision is more complicated and means more costs, however, legally it is correct.

Peculiarities:

  • Payments for gasification must be submitted in a timely manner.
  • The technical conditions are valid only for a certain period and the connection to the pipe must be made during this period (for 3 years), and not when gas already appears in the pipe.
  • The gas organization will without fail demand monthly payment for the maintenance of your section of the gas pipeline, which is as difficult to collect as the contributions themselves in the partnership. In contrast to the individual payment for the volume used, the service charge is collective. Non-payment results in disconnection.
  • The organizations responsible for the supply of gas, with obvious reluctance, agree to actions to transfer the SNT or NP pipe to the balance sheet last, when the branch is dead-end and will not be able to bring profit in the future. In such cases, the branch will need to be serviced continuously while the supply is in progress.

Rating
Website about plumbing

We advise you to read

Where to fill the powder in the washing machine and how much powder to pour